East Bay Construction
- Based in
- Oakland
- On San Francisco permits
- Dec 2022 to Dec 2022
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 42 days from filing to permit and 148 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 29, 2022 | Completed final sign-off Jul 2023 | 131 16th Av | remodel (e) kitchen, bathroom. add washer/dryer at 2/f. remodel 2 (e) bathroom at 3/f. upgrade partail foundation at g/f. construct deck at rear of house (8.4' x 6.6'x 9'h).Details
remodel (e) kitchen, bathroom. add washer/dryer at 2/f. remodel 2 (e) bathroom at 3/f. upgrade partail foundation at g/f. construct deck at rear of house (8.4' x 6.6'x 9'h). | $100,000 |