Back to bathroom remodel contractors
E & T Construction Inc
- Based in
- El Cerrito
- On San Francisco permits
- Dec 2017 to Oct 2020
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 55 days from filing to permit and 189 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 28, 2020 | Completed final sign-off Feb 2022 | 2147 29th Av | enclose interior court & relocate kitchen from 1/f to 2/f. remodel bathroom on 2/f.Details
enclose interior court & relocate kitchen from 1/f to 2/f. remodel bathroom on 2/f. | $10,000 |
| Aug 29, 2018 | Completed final sign-off Feb 2019 | 1286 38th Av | 3rd floor: add a bedroom and a full bath on 1st floor. remove partition wall in unit 1288Details
3rd floor: add a bedroom and a full bath on 1st floor. remove partition wall in unit 1288 | $30,000 |
| Aug 17, 2018 | Completed final sign-off Feb 2019 | 1286 38th Av | bathroom and kitchen remodel. replace (e) cabinets, sink and appliances. repair and replace plumbing with copper, if necessary. update electrical, replace (e) tube and knob. upgrade electrical service w/ 200 amp, re-tile and replace bathroom fixtures in 3rd story bathDetails
bathroom and kitchen remodel. replace (e) cabinets, sink and appliances. repair and replace plumbing with copper, if necessary. update electrical, replace (e) tube and knob. upgrade electrical service w/ 200 amp, re-tile and replace bathroom fixtures in 3rd story bath | $12,000 |