Back to bathroom remodel contractors
E S Construction
- Based in
- Alameda
- On San Francisco permits
- Aug 2015 to May 2023
- Last 24 months
- 0 permits filed
54 permits since 2000: 47 completed, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 3 are 3 to 5 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
45 bathroom remodel permits: 39 completed, 4 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 79 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 22, 2023 | Never finaled issued May 2023, no final | 425 01st St | #2903 kitchen remodel: kitchen cabinets &appliances (like for like), 3 bath remodel-new calgreen rqmnt,fixtures,tubs&toilets,&floor tile (all like for like), replace fluorescent recess lights w/ led (like for like),drywall-repair&repaint. maintain 1hr rating btwn units and ceiling. maintain chp 11a.Details
#2903 kitchen remodel: kitchen cabinets &appliances (like for like), 3 bath remodel-new calgreen rqmnt,fixtures,tubs&toilets,&floor tile (all like for like), replace fluorescent recess lights w/ led (like for like),drywall-repair&repaint. maintain 1hr rating btwn units and ceiling. maintain chp 11a. | $65,000 |
| May 3, 2023 | Completed final sign-off Apr 2025 | 425 01st St | guest/2nd bathroom renovation: no structural demo. install new fl & shower surround tiles, install new shower, faucet (in-kind), install new lav faucet (in-kind) all faucets meet calgreen requirenment, drywall repairs & paint, relocate (e) shell florescent recess lights w/ led ones (in-kind)Details
guest/2nd bathroom renovation: no structural demo. install new fl & shower surround tiles, install new shower, faucet (in-kind), install new lav faucet (in-kind) all faucets meet calgreen requirenment, drywall repairs & paint, relocate (e) shell florescent recess lights w/ led ones (in-kind) | $10,500 |
| Mar 28, 2023 | Never finaled issued Mar 2023, no final | 425 01st St | #2806: 2 bath & 1 kitchen remodel-replace florescent lights with led ones (in-kind),install new plumbing fix(calgreen compliant),install new counter tops (kitchen & bathroom),re-use existing cabs (re-finish) drywall reforms, install new appliances (in kind), painting, new hardwood flooring (in-kind)Details
#2806: 2 bath & 1 kitchen remodel-replace florescent lights with led ones (in-kind),install new plumbing fix(calgreen compliant),install new counter tops (kitchen & bathroom),re-use existing cabs (re-finish) drywall reforms, install new appliances (in kind), painting, new hardwood flooring (in-kind) | $65,000 |
| Mar 10, 2023 | Completed final sign-off Aug 2023 | 425 01st St | water damage repairs: repair (e) florescent lights with led ones (in-kind) install new plumbing fixtures (complaint) install drywall,install new flooring, tile and hard woood fl. (in-kind) install new kitchen and bathroom cabintry, install new appliance (in-kind) painting,Details
water damage repairs: repair (e) florescent lights with led ones (in-kind) install new plumbing fixtures (complaint) install drywall,install new flooring, tile and hard woood fl. (in-kind) install new kitchen and bathroom cabintry, install new appliance (in-kind) painting, | $50,000 |
| Jan 20, 2023 | Completed final sign-off Apr 2023 | 1 Powell St | unit #708: kitchen and bathroom remodeling. no wall alteration. replace cabinets and countertops. plumbing fixtures only, add (6) lights, all work in residental unit.Details
unit #708: kitchen and bathroom remodeling. no wall alteration. replace cabinets and countertops. plumbing fixtures only, add (6) lights, all work in residental unit. | $15,000 |
| Jan 20, 2023 | Completed final sign-off Apr 2023 | 1 Powell St | unit #605: kitchen and bathroom remodeling. no wall alteration. replace cabinets and countertops. plumbing fixtures only, add (6) lights, all work in residental unit.Details
unit #605: kitchen and bathroom remodeling. no wall alteration. replace cabinets and countertops. plumbing fixtures only, add (6) lights, all work in residental unit. | $15,000 |
| Jul 11, 2022 | Never finaled issued Jul 2022, no final | 489 Harrison St | unit 403: reframe/move nonstructural hallway closet walls/laundry, removate/retile in-kind main & guest bathrooms, replace (e) flourescent recessed lights w/led in-kind, new vanity cabinets/countertops, replace shower/vanity fixtures in-kind w/efficient low flow, drywall repairs as neededDetails
unit 403: reframe/move nonstructural hallway closet walls/laundry, removate/retile in-kind main & guest bathrooms, replace (e) flourescent recessed lights w/led in-kind, new vanity cabinets/countertops, replace shower/vanity fixtures in-kind w/efficient low flow, drywall repairs as needed | $25,000 |
| Mar 14, 2022 | Completed final sign-off Apr 2022 | 1 Powell St | unit #505: kitchen & bathroom remodel in-kind. replace cabinets & countertop, plumbing fixtures only and add light. remodel in kind. no wall alteration.Details
unit #505: kitchen & bathroom remodel in-kind. replace cabinets & countertop, plumbing fixtures only and add light. remodel in kind. no wall alteration. | $15,000 |
| Feb 24, 2022 | Completed final sign-off Apr 2022 | 1 Powell St | unit #506. kitchen and bathroom remodel. no wall opening alteration. replace cabinets and countertops, plumbing fixtures only. add lights. all work in residential units.Details
unit #506. kitchen and bathroom remodel. no wall opening alteration. replace cabinets and countertops, plumbing fixtures only. add lights. all work in residential units. | $15,000 |
| Feb 24, 2022 | Completed final sign-off Apr 2022 | 1 Powell St | unit # 808: (1) kitchen & (2) bathroom remodel in-kind. no walls opening alterations. replace cabinets & countertop. plumbing fixture only. add lights.Details
unit # 808: (1) kitchen & (2) bathroom remodel in-kind. no walls opening alterations. replace cabinets & countertop. plumbing fixture only. add lights. | $15,000 |
| Feb 24, 2022 | Completed final sign-off Apr 2022 | 1 Powell St | unit #601. kitchen and bathroom remodel. no wall opening alteration. replace cabinets and countertops, plumbing fixtures only. add lights. all work in residential units.Details
unit #601. kitchen and bathroom remodel. no wall opening alteration. replace cabinets and countertops, plumbing fixtures only. add lights. all work in residential units. | $15,000 |
| Feb 24, 2022 | Completed final sign-off May 2022 | 1 Powell St | unit # 707: (1) kitchen & (1) bathroom remodel in-kind. no walls opening alterations. replace cabinets & countertop. plumbing fixture only.Details
unit # 707: (1) kitchen & (1) bathroom remodel in-kind. no walls opening alterations. replace cabinets & countertop. plumbing fixture only. | $15,000 |
| Feb 24, 2022 | Completed final sign-off May 2022 | 1 Powell St | unit #703. kitchen and bathroom remodel. no wall opening alteration. replace cabinets and countertops, plumbing fixtures only. add lights. all work in residential units.Details
unit #703. kitchen and bathroom remodel. no wall opening alteration. replace cabinets and countertops, plumbing fixtures only. add lights. all work in residential units. | $15,000 |
| Jul 28, 2021 | Completed final sign-off Oct 2021 | 1 Powell St | #403: kitchen and bathroom remodeling, no wall/opening alterations. replace cabinets and counter tops, plumbing fixtures only. add 6 lights, all work in residential unit.Details
#403: kitchen and bathroom remodeling, no wall/opening alterations. replace cabinets and counter tops, plumbing fixtures only. add 6 lights, all work in residential unit. | $10,000 |
| Jul 28, 2021 | Completed final sign-off Oct 2021 | 1 Powell St | #407: kitchen and bathroom remodeling, no wall/opening alterations. replace cabinets and counter tops, plumbing fixtures only. add 6 lights, all work in residential unit.Details
#407: kitchen and bathroom remodeling, no wall/opening alterations. replace cabinets and counter tops, plumbing fixtures only. add 6 lights, all work in residential unit. | $10,000 |
| Jul 28, 2021 | Completed final sign-off Oct 2021 | 1 Powell St | #501: kitchen and bathroom remodeling, no wall/opening alterations. replace cabinets and counter tops, plumbing fixtures only. add 6 lights, all work in residential unit.Details
#501: kitchen and bathroom remodeling, no wall/opening alterations. replace cabinets and counter tops, plumbing fixtures only. add 6 lights, all work in residential unit. | $10,000 |
| Jul 28, 2021 | Completed final sign-off Oct 2021 | 1 Powell St | #801: kitchen and bathroom remodeling, no wall/opening alterations. replace cabinets and counter tops, plumbing fixtures only. add 6 lights, all work in residential unit.Details
#801: kitchen and bathroom remodeling, no wall/opening alterations. replace cabinets and counter tops, plumbing fixtures only. add 6 lights, all work in residential unit. | $10,000 |
| Jul 28, 2021 | Completed final sign-off Oct 2021 | 1 Powell St | #604: kitchen and bathroom remodeling, no wall/opening alterations. replace cabinets and counter tops, plumbing fixtures only. add 6 lights, all work in residential unit.Details
#604: kitchen and bathroom remodeling, no wall/opening alterations. replace cabinets and counter tops, plumbing fixtures only. add 6 lights, all work in residential unit. | $10,000 |
| Jul 28, 2021 | Completed final sign-off Oct 2021 | 1 Powell St | #803: kitchen and bathroom remodeling, no wall/opening alterations. replace cabinets and counter tops, plumbing fixtures only. add 6 lights, all work in residential unit.Details
#803: kitchen and bathroom remodeling, no wall/opening alterations. replace cabinets and counter tops, plumbing fixtures only. add 6 lights, all work in residential unit. | $10,000 |
| Jul 1, 2021 | Completed final sign-off Feb 2023 | 489 Harrison St | unit 507: one kitchen remodel like for like, subpanel. bathroom remodel like for like. half bathroom remodel like for like. bathroom remodel like for like (only change is converting tub to shower)Details
unit 507: one kitchen remodel like for like, subpanel. bathroom remodel like for like. half bathroom remodel like for like. bathroom remodel like for like (only change is converting tub to shower) | $45,000 |
| Apr 28, 2021 | Completed final sign-off May 2022 | 1 Powell St | #702 - kitchen and bathroom remodeling. no walls or opening alterations. replace cabinets and countertops. plumbing fixtures only, add 6 lights, all work in residential unit.Details
#702 - kitchen and bathroom remodeling. no walls or opening alterations. replace cabinets and countertops. plumbing fixtures only, add 6 lights, all work in residential unit. | $15,000 |
| Apr 28, 2021 | Completed final sign-off May 2022 | 1 Powell St | #706 - kitchen and bathroom remodeling. no walls or opening alterations. replace cabinets and countertops. plumbing fixtures only, add 6 lights, all work in residential unit.Details
#706 - kitchen and bathroom remodeling. no walls or opening alterations. replace cabinets and countertops. plumbing fixtures only, add 6 lights, all work in residential unit. | $15,000 |
| Apr 27, 2021 | Completed final sign-off Oct 2021 | 1 Powell St | unit #807: kithcen and bathroom remodeling no walls or opening alterations replace cabinets and countertops, plubming fixutres only, add 6 lights, all work in residential unit. (no moving walls)Details
unit #807: kithcen and bathroom remodeling no walls or opening alterations replace cabinets and countertops, plubming fixutres only, add 6 lights, all work in residential unit. (no moving walls) | $15,000 |
| Apr 27, 2021 | Completed final sign-off Oct 2021 | 1 Powell St | kitchen & bathroom remodeling in #802. no walls or opening alterations. replace cabinets & countertops. plumbing fixtures only. add 6 lights. all work in the residential unit.Details
kitchen & bathroom remodeling in #802. no walls or opening alterations. replace cabinets & countertops. plumbing fixtures only. add 6 lights. all work in the residential unit. | $15,000 |
| Apr 27, 2021 | Completed final sign-off Oct 2021 | 1 Powell St | unit #806: kithcen and bathroom remodeling no walls or opening alterations replace cabinets and countertops, plubming fixutres only, add 6 lights, all work in residential unitDetails
unit #806: kithcen and bathroom remodeling no walls or opening alterations replace cabinets and countertops, plubming fixutres only, add 6 lights, all work in residential unit | $15,000 |
| Apr 26, 2021 | Completed final sign-off Jul 2021 | 1 Powell St | unit 607: kitchen & bathroom remodeling. no walls or openings alterations. replace cabinets and countertops. plumbing fixtures only. add 6 lights. all work in residential unit.Details
unit 607: kitchen & bathroom remodeling. no walls or openings alterations. replace cabinets and countertops. plumbing fixtures only. add 6 lights. all work in residential unit. | $15,000 |
| Apr 26, 2021 | Completed final sign-off Jul 2021 | 1 Powell St | #609 - kitchen and bathroom remodeling. no walls and opening alterations. replace cabinets and countertops. plumbing fixtures only, add 6 lights, all work in residential unit.Details
#609 - kitchen and bathroom remodeling. no walls and opening alterations. replace cabinets and countertops. plumbing fixtures only, add 6 lights, all work in residential unit. | $15,000 |
| Apr 26, 2021 | Completed final sign-off Jul 2021 | 1 Powell St | unit 606: kitchen & bathroom remodeling. no walls or openings alterations. replace cabinets and countertops. plumbing fixtures only. add 6 lights. all work in residential unit.Details
unit 606: kitchen & bathroom remodeling. no walls or openings alterations. replace cabinets and countertops. plumbing fixtures only. add 6 lights. all work in residential unit. | $15,000 |
| Apr 26, 2021 | Completed final sign-off Jul 2021 | 1 Powell St | #608 - kitchen and bathroom remodeling. no walls and opening alterations. replace cabinets and countertops. plumbing fixtures only, add 6 lights, all work in residential unit.Details
#608 - kitchen and bathroom remodeling. no walls and opening alterations. replace cabinets and countertops. plumbing fixtures only, add 6 lights, all work in residential unit. | $15,000 |
| Apr 16, 2021 | Completed final sign-off Jul 2021 | 1 Powell St | one new lighting shall comply w/ cec 150.0 (k) 3 a (k) 5 kitchen and bathroom remodeling n #603 no wall opening alterations replace cabinets and counter tops plumbing fixtures only, add 6 lights all work in residential unit no new wall and no (e) wall relocationDetails
one new lighting shall comply w/ cec 150.0 (k) 3 a (k) 5 kitchen and bathroom remodeling n #603 no wall opening alterations replace cabinets and counter tops plumbing fixtures only, add 6 lights all work in residential unit no new wall and no (e) wall relocation | $10,000 |
| Apr 15, 2021 | Completed final sign-off Jul 2021 | 1 Powell St | kitchen and bathroom remodeling in #602 no wall and opening alterations; replace cabinets and countertops; plumbing fixtures only add 6 lights, all work in residential unit.Details
kitchen and bathroom remodeling in #602 no wall and opening alterations; replace cabinets and countertops; plumbing fixtures only add 6 lights, all work in residential unit. | $10,000 |
| Apr 15, 2021 | Completed final sign-off Jun 2021 | 1 Powell St | kitchen and bathroom remodeling in 508; no wall and opening alterations; replace cabinets and countertops; plumbing and fixtures only; add 6 lights all work in residential unit.Details
kitchen and bathroom remodeling in 508; no wall and opening alterations; replace cabinets and countertops; plumbing and fixtures only; add 6 lights all work in residential unit. | $10,000 |
| Apr 14, 2021 | Completed final sign-off Jun 2021 | 1 Powell St | unit 502: kitchen and bathroom remodel in kind. replace cabinets & counter tops. plumbing fixtures. add 6 lights. no wall/opening altertion.Details
unit 502: kitchen and bathroom remodel in kind. replace cabinets & counter tops. plumbing fixtures. add 6 lights. no wall/opening altertion. | $1,000 |
| Apr 14, 2021 | Completed final sign-off Jun 2021 | 1 Powell St | unit 507: kitchen and bathroom remodel in kind. replace cabinets & counter tops. plumbing fixtures. add 6 lights. no wall/opening altertion.Details
unit 507: kitchen and bathroom remodel in kind. replace cabinets & counter tops. plumbing fixtures. add 6 lights. no wall/opening altertion. | $1,000 |
| Mar 30, 2021 | Completed final sign-off Jun 2021 | 1 Powell St | kitchen and bathroom remodeling in #408 - no wall and opening alterations. replace cabinets and countertops. plumbing fixtures only, add 3 lights, all work in residential unit.Details
kitchen and bathroom remodeling in #408 - no wall and opening alterations. replace cabinets and countertops. plumbing fixtures only, add 3 lights, all work in residential unit. | $10,000 |
| Mar 30, 2021 | Completed final sign-off Jun 2021 | 1 Powell St | unit #402 - kitchen and bathroom remodeling in - no wall and opening alterations. replace cabinets and countertops. plumbing fixtures only, add 3 lights, all work in residential unit.Details
unit #402 - kitchen and bathroom remodeling in - no wall and opening alterations. replace cabinets and countertops. plumbing fixtures only, add 3 lights, all work in residential unit. | $10,000 |
| Mar 16, 2021 | Completed final sign-off Jun 2021 | 1 Powell St | unit 404: kitchen and bathroom remodel. replace cabinets and coutnertops. plumbing fixtures only. add 3 lights. all work in residential unit. no wall or opening alteration.Details
unit 404: kitchen and bathroom remodel. replace cabinets and coutnertops. plumbing fixtures only. add 3 lights. all work in residential unit. no wall or opening alteration. | $6,000 |
| Nov 30, 2020 | Completed final sign-off Oct 2023 | 425 01st St | unit 2302 renovation/remodeling- removing and replacing the hardwood floor. new kitchen/lighting - 2x bathrooms to be renovated with new fixtures & vanity - new paint - new tiles in bathroomDetails
unit 2302 renovation/remodeling- removing and replacing the hardwood floor. new kitchen/lighting - 2x bathrooms to be renovated with new fixtures & vanity - new paint - new tiles in bathroom | $70,000 |
| Sep 14, 2020 | Expired or cancelled expired Apr 2025 | 425 01st St | unit 3104-master bathroom remodel in-kind. install n shower surrounding, tile, vanity, toilet, flooring, and fixtures.Details
unit 3104-master bathroom remodel in-kind. install n shower surrounding, tile, vanity, toilet, flooring, and fixtures. | $5,000 |
| Sep 14, 2020 | Completed final sign-off Jun 2021 | 425 01st St | #5704: remove/reframe non-structural walls. replace tile in both bathrooms. replace existing florescent recess lights with led. install new cabinetry in kitchen & bathrooms. install new plumbing fixtures in bathroom & kitchen. install/replace appliances with new. minor drywall repair & paint.Details
#5704: remove/reframe non-structural walls. replace tile in both bathrooms. replace existing florescent recess lights with led. install new cabinetry in kitchen & bathrooms. install new plumbing fixtures in bathroom & kitchen. install/replace appliances with new. minor drywall repair & paint. | $50,000 |
| Dec 11, 2017 | Completed final sign-off Mar 2018 | 425 01st St | replace (e) fan/light led combo in kind, replace carpet, (e) florescent recess lights with led in kind, replace (e) toggle switches with led dimmers, granite countertops in kitchen & bathrooms with quartz, re-use sinks & replace faucet with high efficency, repair minor drywall. n/a maherDetails
replace (e) fan/light led combo in kind, replace carpet, (e) florescent recess lights with led in kind, replace (e) toggle switches with led dimmers, granite countertops in kitchen & bathrooms with quartz, re-use sinks & replace faucet with high efficency, repair minor drywall. n/a maher | $18,000 |
| Apr 6, 2017 | Completed final sign-off Jul 2017 | 765 Minna St | to comply nov#201769261, drywall repair & insulation install at garage, replace water heater & instrall seismic valve, replace bathroom fan in kind.Details
to comply nov#201769261, drywall repair & insulation install at garage, replace water heater & instrall seismic valve, replace bathroom fan in kind. | $5,000 |
| Mar 16, 2016 | Completed final sign-off Nov 2018 | 190 07th St | remove (e) lavys, wc & (1) tub & (1) shower in (1) 1/2 bath & (2) full ba; remove (e) track lighting & replace with (28) new recessed lights. remove & replace (3) ba fans; add (2) new switches. no walls to be altered or removed. maher n/aDetails
remove (e) lavys, wc & (1) tub & (1) shower in (1) 1/2 bath & (2) full ba; remove (e) track lighting & replace with (28) new recessed lights. remove & replace (3) ba fans; add (2) new switches. no walls to be altered or removed. maher n/a | $20,000 |
| Oct 22, 2015 | Expired or cancelled expired Aug 2019 | 250 Laurel St | interior remodel, kitchen and 2 baths, laundry room and new lighting and plumbing fixturesDetails
interior remodel, kitchen and 2 baths, laundry room and new lighting and plumbing fixtures | $100,000 |
| Aug 7, 2015 | Never finaled issued Aug 2015, no final | 489 Harrison St | #306 restore unit to original floor plan: framing, elect - recess lights, switches, sd's, plumb - kitchen, 2 1/2 baths,drywall - repair, under the 90% that doesn't need to comply. maher naDetails
#306 restore unit to original floor plan: framing, elect - recess lights, switches, sd's, plumb - kitchen, 2 1/2 baths,drywall - repair, under the 90% that doesn't need to comply. maher na | $10,000 |