Back to bathroom remodel contractors
E Martinez Quality Construction
- Based in
- El Sobrante
- On San Francisco permits
- Apr 2022 to Jun 2024
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 14 days from filing to permit and 28 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 29, 2024 | Completed final sign-off Apr 2024 | 3118 18th St | unit 7; bathroom remodel in-kind. bath tub, sink, exhaust fan & ceramic tile replacement. accessiblity to be maintainedDetails
unit 7; bathroom remodel in-kind. bath tub, sink, exhaust fan & ceramic tile replacement. accessiblity to be maintained | $5,000 |
| Apr 29, 2022 | Completed final sign-off Jul 2022 | 264 Montana St | one 45 sq ft bathroom remodel on 2nd floor. no structural no changes to walls or openings. replace existing with (n) curbless shower, toilet and vanity. all (n) fixtures and finishes.Details
one 45 sq ft bathroom remodel on 2nd floor. no structural no changes to walls or openings. replace existing with (n) curbless shower, toilet and vanity. all (n) fixtures and finishes. | $14,500 |