Back to bathroom remodel contractors
E B Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2004 to Sep 2012
- Last 24 months
- 0 permits filed
20 permits since 2000: 18 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 0 days from filing to permit and 90 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 28, 2012 | Completed final sign-off Nov 2012 | 999 Wisconsin St | remodel master bathroom in kind same location high efficiency lights in bathroom in kind, if fan replacement required connect to exisitng ventDetails
remodel master bathroom in kind same location high efficiency lights in bathroom in kind, if fan replacement required connect to exisitng vent | $6,900 |
| Jun 7, 2010 | Completed final sign-off Jul 2010 | 4338 26th St | remodel bathroom and replace (e) window in kind. winoow not visible from street. replace 10 concrete pads. cut some tree roots.Details
remodel bathroom and replace (e) window in kind. winoow not visible from street. replace 10 concrete pads. cut some tree roots. | $6,300 |
| Oct 8, 2009 | Completed final sign-off Jan 2010 | 1465 De Haro St | rev. to pa# 2009.09.21.7258. remove wall btn (e) den and (e) bathroom and pantry on 2nd floor. move it 21 inches back toward bathroom and pantryDetails
rev. to pa# 2009.09.21.7258. remove wall btn (e) den and (e) bathroom and pantry on 2nd floor. move it 21 inches back toward bathroom and pantry | $1,400 |
| Sep 21, 2009 | Completed final sign-off Jan 2010 | 1465 De Haro St | remodel kitchen & bathroom, install recess lighting. no moving or adding wallsDetails
remodel kitchen & bathroom, install recess lighting. no moving or adding walls | $16,000 |
| Oct 2, 2007 | Completed final sign-off Mar 2008 | 440 Teresita Bl | interior remodel of existing sfd to provide new master bedroom, bathroom@ bsmt level. install new spiral stair, new skylight, new i hr wall and footings at garage, new bedroom window at front shall match existing in style and material, electrical and plumbingDetails
interior remodel of existing sfd to provide new master bedroom, bathroom@ bsmt level. install new spiral stair, new skylight, new i hr wall and footings at garage, new bedroom window at front shall match existing in style and material, electrical and plumbing | $47,000 |
| Sep 15, 2005 | Completed final sign-off Nov 2005 | 359 Douglass St | remodel existing bathroom to handicap bathroom. new shower 1 sink /toilet/grab bars and plumping.Details
remodel existing bathroom to handicap bathroom. new shower 1 sink /toilet/grab bars and plumping. | $8,200 |
| Sep 13, 2005 | Completed final sign-off Mar 2006 | 1632 Taylor St | remodel bathroom on second floor.Details
remodel bathroom on second floor. | $9,000 |