Dwyer Construction Inc
- Based in
- Novato
- On San Francisco permits
- Apr 2014 to Jul 2015
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 21 days from filing to permit and 911 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 21, 2014 | Completed final sign-off Nov 2016 | 3732 Fillmore St | remodel (e) kitchen, replace 2 exterior windows with (n) sliding door, (n) opening in load bearing wall to hallway, (n) deck in lightwell, electrical, plumbing in area of remodel, (n) posts and footings on g/f to support (n) opening above.Details
remodel (e) kitchen, replace 2 exterior windows with (n) sliding door, (n) opening in load bearing wall to hallway, (n) deck in lightwell, electrical, plumbing in area of remodel, (n) posts and footings on g/f to support (n) opening above. | $45,000 |