Back to bathroom remodel contractors
Dunrite Construction
- Based in
- San Carlos
- On San Francisco permits
- Jan 2001 to Feb 2018
- Last 24 months
- 0 permits filed
41 permits since 2000: 36 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 9 completed. Typically 0 days from filing to permit and 153 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 8, 2018 | Completed final sign-off Apr 2018 | 159 Octavia St | repair and remodel bathroom. new tiles, tub, vanity , toilet, dry wall. no change in wall and opening layout.Details
repair and remodel bathroom. new tiles, tub, vanity , toilet, dry wall. no change in wall and opening layout. | $20,000 |
| Feb 11, 2016 | Completed final sign-off Apr 2016 | 681 Arkansas St | water damage repair to walls - replace showerstall, toilet & sink to bathroom. replace drywall that was removed. replace ducting that was removed to hvac.Details
water damage repair to walls - replace showerstall, toilet & sink to bathroom. replace drywall that was removed. replace ducting that was removed to hvac. | $30,000 |
| Nov 5, 2015 | Completed final sign-off Jul 2016 | 1065 Clayton St | comply with nov 201567791. repair/replace fire damaged wall, floor, ceiling in kind at basement, 1st and 2nd fl. remodel kitchen, 2 baths, replace interior finsines with 5/8" type x gyp bd per plan maher not reqDetails
comply with nov 201567791. repair/replace fire damaged wall, floor, ceiling in kind at basement, 1st and 2nd fl. remodel kitchen, 2 baths, replace interior finsines with 5/8" type x gyp bd per plan maher not req | $325,000 |
| Sep 27, 2011 | Completed final sign-off Feb 2012 | 61 Toledo Wy | change dressing room to one new bathroom at 3rd flDetails
change dressing room to one new bathroom at 3rd fl | $25,000 |
| Sep 16, 2011 | Completed final sign-off Feb 2012 | 61 Toledo Wy | remove & replace damaged plaster, install type x 5/8" drywall on property line and garage upgrade to bathroom, upgrade to water closet, replace kitchen cabinets and appliances to original condition, replace bathroom fixtures, electrical and plumbing to be done to coce, refer to correction noticeDetails
remove & replace damaged plaster, install type x 5/8" drywall on property line and garage upgrade to bathroom, upgrade to water closet, replace kitchen cabinets and appliances to original condition, replace bathroom fixtures, electrical and plumbing to be done to coce, refer to correction notice | $120,000 |
| Oct 14, 2010 | Completed final sign-off Jun 2011 | 53 Annapolis Tr | revision topa# 2010.07.02.5887. add toilet and handsink to (e) bath rooms at 2nd floorDetails
revision topa# 2010.07.02.5887. add toilet and handsink to (e) bath rooms at 2nd floor | $1,200 |
| Jul 2, 2010 | Completed final sign-off Jun 2011 | 53 Annapolis Tr | to comply with bid nov 201050909; 1)repair/replace fire damage wall, floor and ceiling in-kind at 1st & 2nd floor, per plan. 2)remodel bathroom at 3rd floor.Details
to comply with bid nov 201050909; 1)repair/replace fire damage wall, floor and ceiling in-kind at 1st & 2nd floor, per plan. 2)remodel bathroom at 3rd floor. | $223,000 |
| Mar 1, 2010 | Completed final sign-off May 2010 | 645 Santiago St | replace and repair fire damage walls on 1st and 2nd floors. referenced pa# 8903916 for existing rooms and bathroom at ground floorDetails
replace and repair fire damage walls on 1st and 2nd floors. referenced pa# 8903916 for existing rooms and bathroom at ground floor | $40,000 |
| Apr 14, 2008 | Completed final sign-off Aug 2008 | 1965 48th Av | remodel bathroom & kitchen dryrot repair to front of house. remove & repair front of house stucco. non-structural, in kind.Details
remodel bathroom & kitchen dryrot repair to front of house. remove & repair front of house stucco. non-structural, in kind. | $80,000 |