Dunne Construction
- Based in
- Oakland
- On San Francisco permits
- Sep 2012 to Sep 2012
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 12, 2012 | Completed final sign-off Mar 2013 | 1619 18th St | kitchen remodel and 2 bathroom remodels, approx 1000 sf. new hardwood flr. over living room and painting. new lighting fixtures throughout unit. kitchen lighting min 50% rated wattage high efficacy. bathroom lighting high efficacy maintain or controlled by manual on occupancy sensor.Details
kitchen remodel and 2 bathroom remodels, approx 1000 sf. new hardwood flr. over living room and painting. new lighting fixtures throughout unit. kitchen lighting min 50% rated wattage high efficacy. bathroom lighting high efficacy maintain or controlled by manual on occupancy sensor. | $79,000 |