Back to bathroom remodel contractors
Duncan Wilson Constructioni
- Based in
- San Rafael
- On San Francisco permits
- Feb 2000 to Jul 2021
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 28 days from filing to permit and 489 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 29, 2021 | Completed final sign-off Dec 2022 | 2211 Broderick St | unit 5: relocate bathroom walls, install new tub & sink. relocate toilet. relocate electrical and upgrade.moving wall behind toilet back by approx. 50"; reframe entry door to bathroom.relocate plumbing fixtures.Details
unit 5: relocate bathroom walls, install new tub & sink. relocate toilet. relocate electrical and upgrade.moving wall behind toilet back by approx. 50"; reframe entry door to bathroom.relocate plumbing fixtures. | $50,000 |