Back to bathroom remodel contractors
Duffy Construction
- Based in
- San Anselmo
- On San Francisco permits
- Jan 2009 to Jan 2013
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 112 days from filing to permit and 88 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 16, 2013 | Completed final sign-off Mar 2013 | 3701 Clay St | bathroom remodel unit 1 ground floor. rewire, replumb, retile, replace fixtures, and fittings, relocate tub, new door to hallwayDetails
bathroom remodel unit 1 ground floor. rewire, replumb, retile, replace fixtures, and fittings, relocate tub, new door to hallway | $31,300 |
| Apr 4, 2011 | Completed final sign-off Mar 2012 | 3701 Clay St | revision to pa# 2010-0428-1215-reconfigure bathroom, bedroom, media room layout at attic & laundry.Details
revision to pa# 2010-0428-1215-reconfigure bathroom, bedroom, media room layout at attic & laundry. |