Back to bathroom remodel contractors
Dufficy Fine Carpentry And Design
- Based in
- San Francisco
- On San Francisco permits
- Jun 2008 to Sep 2011
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 1 days from filing to permit and 62 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 23, 2008 | Completed final sign-off Aug 2008 | 695 05th St | unit 10: add non structural walls 0n 1st floor. l shaped partial wall near exit door. wall on outside of bathroom to create wider closet opening, wall to divide space to create another closetDetails
unit 10: add non structural walls 0n 1st floor. l shaped partial wall near exit door. wall on outside of bathroom to create wider closet opening, wall to divide space to create another closet | $7,000 |