Duenas Duenas
- Based in
- Vallejo
- On San Francisco permits
- May 2011 to Apr 2016
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 1, 2016 | Completed final sign-off May 2016 | 2100 Jackson St | concrete repairs of spalling concrete beam on roof area, as per enginering drawings attached. comply with nov 201692984 items, 2,3,4, and 8; fire escape functionality. n/a maher ord 155-13Details
concrete repairs of spalling concrete beam on roof area, as per enginering drawings attached. comply with nov 201692984 items, 2,3,4, and 8; fire escape functionality. n/a maher ord 155-13 | $2,500 |
| May 3, 2011 | Completed final sign-off Sep 2012 | 1801 Church St | foundation repair/replacement work per attached plans. required egress shall be maintained during and after construction.Details
foundation repair/replacement work per attached plans. required egress shall be maintained during and after construction. | $20,000 |