Drive Technologies Inc Dba Treehouse
- Based in
- Detroit
- On San Francisco permits
- Sep 2023 to Mar 2026
- Last 24 months
- 2 permits filed
3 permits since 2000: 1 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 17, 2026 | In progress issued Jun 2026 | 1683 23rd Av | solar permit: installing 14 solar pv modules, 250 watts per module, total no. of rating 3.5 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 11.5 kwh each in capacity, ess units will not be closer than 3 feet | install (1) tesla powerwall 3 on gaDetails
solar permit: installing 14 solar pv modules, 250 watts per module, total no. of rating 3.5 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 11.5 kwh each in capacity, ess units will not be closer than 3 feet | install (1) tesla powerwall 3 on ga | $20,591 |
| Dec 15, 2025 | Completed final sign-off Mar 2026 | 710 05th Av | solar permit: ballasted: n, including 1 energy storage unit, of 240 vac, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | installation of tesla powerwall 3 with gateway and remote energy meterDetails
solar permit: ballasted: n, including 1 energy storage unit, of 240 vac, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | installation of tesla powerwall 3 with gateway and remote energy meter | $22,450 |
| Sep 19, 2023 | Never finaled filed Sep 2023, never issued | 75 Van Buren St | electric vehicle charger installation.Details
electric vehicle charger installation. | $699 |