Permit GraphShortlistSan Francisco building permits since 2000

Driftwood Builders Llc

Contractor license
1068753
State license record
Based in
Pacifica
On San Francisco permits
Mar 2021 to Jun 2021
Last 24 months
0 permits filed

2 permits since 2000: 1 completed, 1 never finaled.

Of the 1 never-finaled permit, 1 is 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Bathroom remodel permits

AllDeck 1Stairs 1Bathroom remodel 1

1 bathroom remodel permit: 1 completed. Typically 80 days from filing to permit and 257 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Mar 22, 2021Completed
final sign-off Feb 2022
231 Ney Stcosmetic upgrades to existing bathroom. replace existing flooring, toilet, sink, and shower fixtures.
Details
Permit
202103226951
Permit issued
Jun 10, 2021
Final sign-off
Feb 22, 2022

cosmetic upgrades to existing bathroom. replace existing flooring, toilet, sink, and shower fixtures.

Open the permit page

$10,000