Doughty Brothers Construction
- Based in
- Benicia
- On San Francisco permits
- Mar 2005 to Jan 2008
- Last 24 months
- 0 permits filed
6 permits since 2000: 2 completed, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 expired or cancelled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 9, 2007 | Expired or cancelled expired Jan 2010 | 2927 Folsom St | repair water damage to 4 bathrooms & new shower pans as needed. repair drywall + stop water leak in ceiling. new floor + covering apply wet patch to roof initially. minor dry rot repair. repair roof less than 25%. all work in bathroom area. repair handrailing /rear side deck + windows. per nov#Details
repair water damage to 4 bathrooms & new shower pans as needed. repair drywall + stop water leak in ceiling. new floor + covering apply wet patch to roof initially. minor dry rot repair. repair roof less than 25%. all work in bathroom area. repair handrailing /rear side deck + windows. per nov# | $28,000 |
| Jan 30, 2006 | Expired or cancelled expired Oct 2008 | 447 Linden St | new permit to satify notice of violation dated 1/18/2006(change in envelope approved in error sent back to planning)move 1st floor foundation ut 3 feet for a lengh of 29 ' under deck/this permit provides dcp approval in conjunction with #200506225740Details
new permit to satify notice of violation dated 1/18/2006(change in envelope approved in error sent back to planning)move 1st floor foundation ut 3 feet for a lengh of 29 ' under deck/this permit provides dcp approval in conjunction with #200506225740 |