Back to bathroom remodel contractors
Domus Construction & Design
- Based in
- Roseville
- On San Francisco permits
- Jan 2007 to Oct 2013
- Last 24 months
- 0 permits filed
32 permits since 2000: 32 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 14 completed. Typically 1 days from filing to permit and 246 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 11, 2013 | Completed final sign-off Aug 2014 | 277 Arlington St | revision to pa# 201305096592. relocate (e) stairway, dining, kitchen & bathroom at 2nd sloor. add (n) laudry room at 2nd floor. to complwy with nov 20118936.Details
revision to pa# 201305096592. relocate (e) stairway, dining, kitchen & bathroom at 2nd sloor. add (n) laudry room at 2nd floor. to complwy with nov 20118936. | $10,000 |
| Jun 14, 2013 | Completed final sign-off Apr 2014 | 1919 San Jose Av | horizontal enlargment - 1st fl: add bedroom, family, 2 bath, hall. 2nd fl: remodel kitchen, bath, add full bath & interior stairs to 1st fl. replace rear stairs & deck, like kind. replace all windows, front wood clad type (visible from street)Details
horizontal enlargment - 1st fl: add bedroom, family, 2 bath, hall. 2nd fl: remodel kitchen, bath, add full bath & interior stairs to 1st fl. replace rear stairs & deck, like kind. replace all windows, front wood clad type (visible from street) | $65,000 |
| Jun 7, 2013 | Completed final sign-off Feb 2014 | 1030 Oak St | unit #1030-remodel kitchen & convert study room into full bathroom at 3rd floor onlyDetails
unit #1030-remodel kitchen & convert study room into full bathroom at 3rd floor only | $20,000 |
| Aug 27, 2012 | Completed final sign-off Jan 2013 | 226 Mallorca Wy | remove & replace drywall, electrical & plumbing, relocate shower, new kitchen cabinets, like for like, window in bath.Details
remove & replace drywall, electrical & plumbing, relocate shower, new kitchen cabinets, like for like, window in bath. | $29,500 |
| Jul 9, 2012 | Completed final sign-off Dec 2012 | 744 Clementina St | interior remodel of kitchen, bathroom, bedroom, and living room of unit #1 only.Details
interior remodel of kitchen, bathroom, bedroom, and living room of unit #1 only. | $21,200 |
| Nov 15, 2011 | Completed final sign-off Aug 2012 | 331 Detroit St | revision to appl #201108263396 to comply w/complaint #201170714 - repair & replace existing dryrot & door framing at rear bathroom & storage. provide new exterior foundation at rear. demolition deck & siding.Details
revision to appl #201108263396 to comply w/complaint #201170714 - repair & replace existing dryrot & door framing at rear bathroom & storage. provide new exterior foundation at rear. demolition deck & siding. | $15,000 |
| Aug 26, 2011 | Completed final sign-off Aug 2012 | 331 Detroit St | kithen & three bathrooms remodel. replace windows & sliding door, new entry door within (e) opening same size. new garage door. dry rot repair at entry stair less than 50%. per mit to comply with n.o.v. dated 12-1498, complaint # 199817780.Details
kithen & three bathrooms remodel. replace windows & sliding door, new entry door within (e) opening same size. new garage door. dry rot repair at entry stair less than 50%. per mit to comply with n.o.v. dated 12-1498, complaint # 199817780. | $45,500 |
| May 4, 2011 | Completed final sign-off May 2012 | 744 Clementina St | #4- kitchen and bathroom remodeling, plumbing & electrical work incl. lighting to comply with cec 150(k). no change to walls, windows or doors.Details
#4- kitchen and bathroom remodeling, plumbing & electrical work incl. lighting to comply with cec 150(k). no change to walls, windows or doors. | $26,000 |
| Apr 25, 2011 | Completed final sign-off Jun 2011 | 1023 Church St | kitchen & bathroom remodeling-kitchen al least 50% high efficacy lighting by wattage, cec 150(k). bathroom-high efficacy or occupancy sensorDetails
kitchen & bathroom remodeling-kitchen al least 50% high efficacy lighting by wattage, cec 150(k). bathroom-high efficacy or occupancy sensor | $35,566 |
| Mar 18, 2011 | Completed final sign-off Apr 2011 | 1575 Broadway | unit # 14: change window in bathroom, to comply with nov 201081467.Details
unit # 14: change window in bathroom, to comply with nov 201081467. | $100 |
| Jan 28, 2011 | Completed final sign-off May 2012 | 744 Clementina St | #2, 5, 6- demolition & remodeling kitchen and bath at unit #2, 5 & 6. to comply nov #200672987, 200676707, 20075056- plumbing, electrical, drywall, replace 4 (e) window at rear in unit #2 same size, drywall at unit #2 & 4 5/8" type x gyp. in kind. no structural work.Details
#2, 5, 6- demolition & remodeling kitchen and bath at unit #2, 5 & 6. to comply nov #200672987, 200676707, 20075056- plumbing, electrical, drywall, replace 4 (e) window at rear in unit #2 same size, drywall at unit #2 & 4 5/8" type x gyp. in kind. no structural work. | $50,000 |
| Oct 13, 2010 | Completed final sign-off Feb 2011 | 26 Cervantes Bl | kitchen and 2 bath remodeling, kitchen: at least 50% high efficacy lighting (by wattage); bathrm- high efficacy lighting or occupancy sensorDetails
kitchen and 2 bath remodeling, kitchen: at least 50% high efficacy lighting (by wattage); bathrm- high efficacy lighting or occupancy sensor | $10,000 |
| Sep 24, 2010 | Completed final sign-off Jul 2011 | 350 Upper Tr | unit #1 & 2- kitchen and one bath remodeling, no structural changes, new lighting comply with cec 150(k)Details
unit #1 & 2- kitchen and one bath remodeling, no structural changes, new lighting comply with cec 150(k) | $35,000 |
| Jun 17, 2010 | Completed final sign-off Nov 2010 | 332 Wilde Av | comply with nov 201045581: kitchen and bath remodel on 2nd floor. repaint all interior walls. verify gr floor bedrooms per approved app 200606204497.Details
comply with nov 201045581: kitchen and bath remodel on 2nd floor. repaint all interior walls. verify gr floor bedrooms per approved app 200606204497. | $8,000 |