Doherty Construction

Contractor license
916866
State license record
Based in
Redwood City
On San Francisco permits
Aug 2014 to Oct 2017
Last 24 months
0 permits filed

4 permits since 2000: 3 completed, 1 never finaled.

Of the 1 never-finaled permit, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
Oct 23, 2017Completed
final sign-off Jan 2018
1024 Potrero Avunit # 3, remove damaged sheetrock tile & linoleum flooring, (water damaged) install new sheetrock , tile & flooring, repalce tub, seperate pid permit.
Details
Permit
201710231902
Status
complete
Filed
Oct 23, 2017
Permit issued
Oct 23, 2017
Final sign-off
Jan 31, 2018
Declared cost
$7,500
Address
1024 Potrero Av

unit # 3, remove damaged sheetrock tile & linoleum flooring, (water damaged) install new sheetrock , tile & flooring, repalce tub, seperate pid permit.

Open the permit page

$7,500
Apr 4, 2017Completed
final sign-off Jun 2017
1350 La Playafront building, remove (e) treads and risers due to cracks; pour new 7x11 concrete treads and risers for support replacement of new treads and risers, replace existing with blue stone to match old. remove and replace (e) hand rail to match existing. bring hand rail to code; less than 50%
Details
Permit
201704043139
Status
complete
Filed
Apr 4, 2017
Permit issued
Apr 4, 2017
Final sign-off
Jun 16, 2017
Declared cost
$6,000
Address
1350 La Playa

front building, remove (e) treads and risers due to cracks; pour new 7x11 concrete treads and risers for support replacement of new treads and risers, replace existing with blue stone to match old. remove and replace (e) hand rail to match existing. bring hand rail to code; less than 50%

Open the permit page

$6,000
Mar 2, 2017Completed
final sign-off Jun 2017
1350 La Playainkind replacement of front stucco on front building due to weatherproofing repairs (same stucco finish); replace windows with aluminum-clad wood doublehung windows on front elevation of front building
Details
Permit
201703020459
Status
complete
Filed
Mar 2, 2017
Permit issued
Mar 2, 2017
Final sign-off
Jun 16, 2017
Declared cost
$18,600
Address
1350 La Playa

inkind replacement of front stucco on front building due to weatherproofing repairs (same stucco finish); replace windows with aluminum-clad wood doublehung windows on front elevation of front building

Open the permit page

$18,600
Aug 15, 2014Never finaled
issued Aug 2014, no final
380 Chestnut Stinstall sill bolts 5/8" plywood panels & 5/8" gyp bd along basement, bind wall along side property line; remove 18-24 of dry wall @ footing, drill 5/8" holes into (e) concrete footing, 32" apart and 9" in @ end of sill plate, fill with epoxy embed 8" of 5/8" rod, lock sill down with 3" sq. washer,
Details
Permit
201408153932
Status
issued
Filed
Aug 15, 2014
Permit issued
Aug 15, 2014
Declared cost
$5,600
Address
380 Chestnut St

install sill bolts 5/8" plywood panels & 5/8" gyp bd along basement, bind wall along side property line; remove 18-24 of dry wall @ footing, drill 5/8" holes into (e) concrete footing, 32" apart and 9" in @ end of sill plate, fill with epoxy embed 8" of 5/8" rod, lock sill down with 3" sq. washer,

Open the permit page

$5,600