Permit GraphShortlistSan Francisco building permits since 2000

Doherty Construction

Contractor license
829960
State license record
Based in
San Francisco
On San Francisco permits
May 2004 to Mar 2015
Last 24 months
0 permits filed

34 permits since 2000: 30 completed, 3 never finaled, 1 expired or cancelled.

Of the 3 never-finaled permits, 3 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Deck permits

AllDeck 4Stairs 8Kitchen remodel 7Bathroom remodel 9

4 deck permits: 4 completed. Typically 0 days from filing to permit and 32 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Mar 27, 2015Completed
final sign-off May 2015
335 Quintara Streplace siding on 2 levels at rear of building; remove (e) tile on 2/f deck at rear; add (n) membrane and add new tiles. no structural work to be done.
Details
Permit
201503272096
Status
complete
Filed
Mar 27, 2015
Permit issued
Mar 27, 2015
Final sign-off
May 1, 2015
Declared cost
$11,500
Address
335 Quintara St

replace siding on 2 levels at rear of building; remove (e) tile on 2/f deck at rear; add (n) membrane and add new tiles. no structural work to be done.

Open the permit page

$11,500
Jan 7, 2015Completed
final sign-off Jul 2015
1865 Broadway3rd floor: remodel bathroom on extg top floor level and change window and door size at extg rear wall leading to extg deck.
Details
Permit
201501075136
Status
complete
Filed
Jan 7, 2015
Permit issued
Jan 8, 2015
Final sign-off
Jul 14, 2015
Declared cost
$25,000
Address
1865 Broadway

3rd floor: remodel bathroom on extg top floor level and change window and door size at extg rear wall leading to extg deck.

Open the permit page

$25,000
Apr 1, 2010Completed
final sign-off Apr 2010
1354 Rhode Island Strevision to appl #200806305675 to increase cost by an additional $25,000 per correction notice.replace deck boards on top portion of (e) rear deck. no stairs, joist or reailings to be touches. dryrot repair only. (no plan).
Details
Permit
201004019505
Status
complete
Filed
Apr 1, 2010
Permit issued
Apr 1, 2010
Final sign-off
Apr 5, 2010
Declared cost
$25,000
Address
1354 Rhode Island St

revision to appl #200806305675 to increase cost by an additional $25,000 per correction notice.replace deck boards on top portion of (e) rear deck. no stairs, joist or reailings to be touches. dryrot repair only. (no plan).

Open the permit page

$25,000
Jan 21, 2010Completed
final sign-off Feb 2010
2393 Filbert Stno door & no window work on this permit. dry rot repair on (e) decks, less than 50% to be worked upon, replace in kind, not visible from street
Details
Permit
201001215070
Status
complete
Filed
Jan 21, 2010
Permit issued
Jan 21, 2010
Final sign-off
Feb 19, 2010
Declared cost
$5,000
Address
2393 Filbert St

no door & no window work on this permit. dry rot repair on (e) decks, less than 50% to be worked upon, replace in kind, not visible from street

Open the permit page

$5,000