Back to bathroom remodel contractors
Dmsquare Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2006 to May 2018
- Last 24 months
- 0 permits filed
48 permits since 2000: 43 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
21 bathroom remodel permits: 19 completed, 1 never finaled, 1 expired or cancelled. Typically 6 days from filing to permit and 121 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 10, 2017 | Completed final sign-off Oct 2017 | 2238 Vicente St | unit #4 - remodel 3rd floor back unit work to include changing inside floor plan to add 1 new bedroom, relocate kitchen, remodel bathroom; replacing 4 windows & adding 1 new window.Details
unit #4 - remodel 3rd floor back unit work to include changing inside floor plan to add 1 new bedroom, relocate kitchen, remodel bathroom; replacing 4 windows & adding 1 new window. | $10,000 |
| Jun 20, 2016 | Completed final sign-off Jul 2019 | 2238 Vicente St | unit legalization ordinance 43-14. legalize in law uit on ground floor of building and to build new kitchen with stove, cabinets, fan & refrigerator & sink, contruct (relocate) bathroom to new location with showver stall, vanity and toilet & all associated elctrical & plumbing work.Details
unit legalization ordinance 43-14. legalize in law uit on ground floor of building and to build new kitchen with stove, cabinets, fan & refrigerator & sink, contruct (relocate) bathroom to new location with showver stall, vanity and toilet & all associated elctrical & plumbing work. | $12,000 |
| Mar 29, 2016 | Completed final sign-off Nov 2017 | 3195 San Bruno Av | to comply w/201586881 - remove non-bearing walls to add 1 full bathroom on 2nd floor. relocate kitchen counter per plan. n/a maher ordinanceDetails
to comply w/201586881 - remove non-bearing walls to add 1 full bathroom on 2nd floor. relocate kitchen counter per plan. n/a maher ordinance | $10,000 |
| Jan 22, 2016 | Completed final sign-off Nov 2017 | 3195 San Bruno Av | revision to pa 201512034117l: turn power room to full bathroom on 1st. add 1 bathroom on 1st flr. add 1 bedroom on 2nd. relocate closet opening on 2nd flr. bearing wall to be removed on 2nd. maher naDetails
revision to pa 201512034117l: turn power room to full bathroom on 1st. add 1 bathroom on 1st flr. add 1 bedroom on 2nd. relocate closet opening on 2nd flr. bearing wall to be removed on 2nd. maher na | |
| Dec 3, 2015 | Completed final sign-off Aug 2016 | 3195 San Bruno Av | relocate (e) full bath on 1st floor per plan; add one office & powder on 1st floor per plan; legalize as-built full bath (bath #2) add bedroom #3 on 2nd floor per plan; remodel (e) bath #1 on 2nd floor; add one full bath (bath #3) on 2nd floor per plan. maher naDetails
relocate (e) full bath on 1st floor per plan; add one office & powder on 1st floor per plan; legalize as-built full bath (bath #2) add bedroom #3 on 2nd floor per plan; remodel (e) bath #1 on 2nd floor; add one full bath (bath #3) on 2nd floor per plan. maher na | $40,000 |
| Dec 23, 2014 | Never finaled issued Dec 2014, no final | 11 University St | 1/ add deck in rear per plan; 2/add 2 bedrooms, 2 bathrooms, game room & office on 1//f per planDetails
1/ add deck in rear per plan; 2/add 2 bedrooms, 2 bathrooms, game room & office on 1//f per plan | $48,000 |
| Nov 12, 2014 | Expired or cancelled expired Jul 2017 | 2476 21st Av | replace drywall, remodel kitchen, remodel bathroom.Details
replace drywall, remodel kitchen, remodel bathroom. | $15,000 |
| Oct 22, 2014 | Completed final sign-off Apr 2016 | 725 Rolph St | add full bathroom at the gound floor. relocating furnace & washer/dryer.Details
add full bathroom at the gound floor. relocating furnace & washer/dryer. | $10,000 |
| Jan 9, 2013 | Completed final sign-off May 2013 | 2238 Vicente St | work @ unit# 2 & ground level only. convert 2 (e) storage rooms to bedrooms on 1st floor. relocate kitchen & bathroom. remodel consists of vanity & ventilation fan replacement only on 2nd floor. replace windows in kind on 2nd floor per plan at rear (4 windows only). construct new stair per plan.Details
work @ unit# 2 & ground level only. convert 2 (e) storage rooms to bedrooms on 1st floor. relocate kitchen & bathroom. remodel consists of vanity & ventilation fan replacement only on 2nd floor. replace windows in kind on 2nd floor per plan at rear (4 windows only). construct new stair per plan. | $40,300 |
| Aug 31, 2012 | Completed final sign-off Mar 2013 | 150 El Camino Del Mar | remodel 2 bathroom @ 4th floorDetails
remodel 2 bathroom @ 4th floor | $22,000 |
| May 2, 2012 | Completed final sign-off Jun 2012 | 2238 Vicente St | replace/existing window in the back unit kitchen facing the interior light well on the 2nd flr; move 1 bathroom sink existing to provide more clearance from existing toilet to comply with nov 201218241; u value less 0.4Details
replace/existing window in the back unit kitchen facing the interior light well on the 2nd flr; move 1 bathroom sink existing to provide more clearance from existing toilet to comply with nov 201218241; u value less 0.4 | $500 |
| Apr 12, 2012 | Completed final sign-off Oct 2012 | 2238 Vicente St | ground floor - install 3 partition walls, 2 doors, replace existing bathroom vanity & toilet & install new shower stall.construct wood flooring, sheetrock walls & ceilings on existing framing all in ground level.Details
ground floor - install 3 partition walls, 2 doors, replace existing bathroom vanity & toilet & install new shower stall.construct wood flooring, sheetrock walls & ceilings on existing framing all in ground level. | $3,000 |
| Oct 18, 2011 | Completed final sign-off Apr 2012 | 2639 21st Av | fill in space under 2nd floor sunroom, to add one famil room, two bedroom and full bathroom on existing ground floor.Details
fill in space under 2nd floor sunroom, to add one famil room, two bedroom and full bathroom on existing ground floor. | $33,000 |
| May 3, 2011 | Completed final sign-off Sep 2011 | 2332 Ortega St | add approx 413 sq ft. add 2 bedrooms and 2 bathrooms at 1st floor.Details
add approx 413 sq ft. add 2 bedrooms and 2 bathrooms at 1st floor. | $26,000 |
| Aug 3, 2009 | Completed final sign-off Nov 2009 | 3009 Balboa St | install one exercise room and full bathroom at garage floor.Details
install one exercise room and full bathroom at garage floor. | $15,000 |
| Apr 24, 2009 | Completed final sign-off Jul 2009 | 1526 17th Av | remodle bathroom. (changing bath, sink, toilet & tile. also light and venthood).Details
remodle bathroom. (changing bath, sink, toilet & tile. also light and venthood). | $9,000 |
| May 28, 2008 | Completed final sign-off Aug 2008 | 2390 30th Av | install one office room, one bedroom, one bathroom at garage floorDetails
install one office room, one bedroom, one bathroom at garage floor | $20,000 |
| May 8, 2008 | Completed final sign-off Aug 2008 | 2082 43rd Av | remodel bath & kitchen. no structural work.Details
remodel bath & kitchen. no structural work. | $14,624 |
| Feb 26, 2008 | Completed final sign-off May 2008 | 2001 Noriega St | convert dinning room on second floor to bedroom. convert portion of garage to bedroom and a full bathDetails
convert dinning room on second floor to bedroom. convert portion of garage to bedroom and a full bath | $16,000 |
| Feb 26, 2007 | Completed final sign-off Apr 2007 | 9 Toyon Ln | remodel toilet, bath & sink in bathroom.Details
remodel toilet, bath & sink in bathroom. | $4,500 |
| Jul 26, 2006 | Completed final sign-off Oct 2006 | 1590 12th Av | remodeling bathroom. kitchen (changing cabinet and tiles. flourencent lighting.Details
remodeling bathroom. kitchen (changing cabinet and tiles. flourencent lighting. | $8,000 |