Back to bathroom remodel contractors
Dlw Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2008 to Jun 2018
- Last 24 months
- 0 permits filed
53 permits since 2000: 40 completed, 10 never finaled, 3 expired or cancelled.
Of the 10 never-finaled permits, 3 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 13 completed, 2 never finaled. Typically 1 days from filing to permit and 158 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 28, 2016 | Never finaled issued Oct 2016, no final | 67 Landers St | 3 new dormers and renovate extg attic into habitable space, new master bedroom and bath, new stair front ground floor to new 3rd floor. legalize extg ground floor bedroom/bath/laundry into new bath laundry and familyroom. separate habit space from garage. no other roof line expansion other than dormDetails
3 new dormers and renovate extg attic into habitable space, new master bedroom and bath, new stair front ground floor to new 3rd floor. legalize extg ground floor bedroom/bath/laundry into new bath laundry and familyroom. separate habit space from garage. no other roof line expansion other than dorm | $125,000 |
| Jun 23, 2015 | Never finaled issued Jun 2015, no final | 2545 Lake St | replace front facade windows in like kind and remodle second floor bathroom. windows will be made of wood and will have same divided light pattern.Details
replace front facade windows in like kind and remodle second floor bathroom. windows will be made of wood and will have same divided light pattern. | $40,000 |
| Oct 7, 2013 | Completed final sign-off Mar 2014 | 49 Stillings Av | new bathroom on 1st fl. additon of 72 sq of space to family room on 2nd fl. reovate kitchen and reconfigure pantry on 2nd fl. reovate bath on 3rd flDetails
new bathroom on 1st fl. additon of 72 sq of space to family room on 2nd fl. reovate kitchen and reconfigure pantry on 2nd fl. reovate bath on 3rd fl | $150,000 |
| Aug 27, 2013 | Completed final sign-off Oct 2013 | 49 Stillings Av | limited nonstructural demolition of partitions, doors, cabinets and fixtures in preperation for renovation of kitchen and bathrooms.Details
limited nonstructural demolition of partitions, doors, cabinets and fixtures in preperation for renovation of kitchen and bathrooms. | $10,000 |
| Mar 19, 2013 | Completed final sign-off Jun 2013 | 523 Bryant St | tenant improvements including 1st & 2nd floor windows, accessibility compliant main entry & bathrooms, new guardrail & handrail, new partion walls.Details
tenant improvements including 1st & 2nd floor windows, accessibility compliant main entry & bathrooms, new guardrail & handrail, new partion walls. | $120,000 |
| Jan 23, 2012 | Completed final sign-off Dec 2012 | 120 11th St | replace 2-(e) roll-up doors, replace 2-(e) man doors in-kind. refurbish (e) steel framed windows(9). install (n) hardwood floor. ovelay (e) concrete floor. skim coat & paint (e) bathroom & stairwell. all work non-structural.Details
replace 2-(e) roll-up doors, replace 2-(e) man doors in-kind. refurbish (e) steel framed windows(9). install (n) hardwood floor. ovelay (e) concrete floor. skim coat & paint (e) bathroom & stairwell. all work non-structural. | $56,000 |
| Dec 14, 2010 | Completed final sign-off Oct 2011 | 640 Davis St | kitchen and (3) bath remodel. kitchen: at least 50% high efficacy lighting. bathroom: high efficancy or occupancy sensor no change to exhaust system. no windows, doors, ceilings or walls on this permit.Details
kitchen and (3) bath remodel. kitchen: at least 50% high efficacy lighting. bathroom: high efficancy or occupancy sensor no change to exhaust system. no windows, doors, ceilings or walls on this permit. | $40,000 |
| Jul 8, 2009 | Completed final sign-off Mar 2010 | 3 Nebraska St | revision to pa# 200901291058 to comply with notice of correction by field inspector on june 18, 2009 at rear portion of the building ( sitting and bath rooms). reconstrut north and south walls. create 1 hr separation wall at south wall with 30" parapet. omit fire placeDetails
revision to pa# 200901291058 to comply with notice of correction by field inspector on june 18, 2009 at rear portion of the building ( sitting and bath rooms). reconstrut north and south walls. create 1 hr separation wall at south wall with 30" parapet. omit fire place | $5,000 |
| Jan 29, 2009 | Completed final sign-off Mar 2010 | 3 Nebraska St | reconfigure, remodel kitchen & laundry area, relocate 1st fl bathroom, add gas fireplace, replace rear french door w/ large slider door, add skylights.Details
reconfigure, remodel kitchen & laundry area, relocate 1st fl bathroom, add gas fireplace, replace rear french door w/ large slider door, add skylights. | $75,000 |
| Jan 14, 2009 | Completed final sign-off Apr 2009 | 2164 Hyde St | 1 bathroom renovation-remove existing finishes & fixtures. relocate sink vanity & bathtub. install new shower & bidet in addition to toilet, tub sink install new electrical fixture, plumbing fixtures & finish.Details
1 bathroom renovation-remove existing finishes & fixtures. relocate sink vanity & bathtub. install new shower & bidet in addition to toilet, tub sink install new electrical fixture, plumbing fixtures & finish. | $40,000 |
| Aug 1, 2008 | Completed final sign-off Oct 2008 | 765 Market St | work @ unit# 31a only. bathroom remodel. replace vanity, bathtub & toilet. no structural work. lighting to be fluorescant or on occupant sensor.Details
work @ unit# 31a only. bathroom remodel. replace vanity, bathtub & toilet. no structural work. lighting to be fluorescant or on occupant sensor. | $35,000 |
| May 29, 2008 | Completed final sign-off Jul 2008 | 82 Ringold St | revision to 100801233095: changes to closet 1 and 2 to be deleted. add plan office and storage room, change to bathroom floor plan and additonal closet. title 24 submittal per inspectors request.Details
revision to 100801233095: changes to closet 1 and 2 to be deleted. add plan office and storage room, change to bathroom floor plan and additonal closet. title 24 submittal per inspectors request. | |
| May 29, 2008 | Completed final sign-off May 2009 | 870 Ashbury St | remodel existing bedroom, office, bathroom, laundry room on third floor. infill bathroom windowDetails
remodel existing bedroom, office, bathroom, laundry room on third floor. infill bathroom window | $45,000 |
| Feb 6, 2008 | Completed final sign-off Apr 2008 | 1200 Gough St | closet & bathroom remodel. no structural work. bathroom lighting to be flourescent or on occupant sensor.Details
closet & bathroom remodel. no structural work. bathroom lighting to be flourescent or on occupant sensor. | $7,500 |
| Jan 23, 2008 | Completed final sign-off Jul 2008 | 82 Ringold St | interior remodel, studio space and bathroom, remove mezzanine and build new walls & lighting.Details
interior remodel, studio space and bathroom, remove mezzanine and build new walls & lighting. | $25,000 |