Back to bathroom remodel contractors
Dimension Construction Inc
- Based in
- Pinole
- On San Francisco permits
- Sep 2019 to Dec 2025
- Last 24 months
- 1 permit filed
6 permits since 2000: 3 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 expired or cancelled. Typically 310 days from filing to permit and 383 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 19, 2021 | Completed final sign-off Nov 2022 | 324 Baden St | revision to pa 202009214624. install (n) rear deck less than 10'-0" height. dry rot repair of front stucco stair wall. infill (e) south lightwell 14 sq ft area. addition of 673.5 sq ft at 1st flr with (e) envelope incl 2 baths & nursery rm. install (n) high efficiency furnace and tankless water heatDetails
revision to pa 202009214624. install (n) rear deck less than 10'-0" height. dry rot repair of front stucco stair wall. infill (e) south lightwell 14 sq ft area. addition of 673.5 sq ft at 1st flr with (e) envelope incl 2 baths & nursery rm. install (n) high efficiency furnace and tankless water heat | $80,000 |
| Sep 27, 2019 | Expired or cancelled expired Mar 2024 | 2622 Greenwich St | revision to 201610261228 excavation of basement level below the 1st level and at rear terrace. new stairs and elevator to service the basement to 1st fl new terrace at basement level. bedroom, full bath, playroom, storage/gymDetails
revision to 201610261228 excavation of basement level below the 1st level and at rear terrace. new stairs and elevator to service the basement to 1st fl new terrace at basement level. bedroom, full bath, playroom, storage/gym | $150,000 |