Back to bathroom remodel contractors
Dietsch Montaldo Keeneyand Dietsch
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Jul 2003
- Last 24 months
- 0 permits filed
26 permits since 2000: 18 completed, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 3 completed, 1 never finaled, 2 expired or cancelled. Typically 25 days from filing to permit and 266 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 15, 2003 | Completed final sign-off Dec 2003 | 271 Surrey St | remodel kitchen & bath; repl cabs,(n)counter,(n)floor (tile) no reconfigurationDetails
remodel kitchen & bath; repl cabs,(n)counter,(n)floor (tile) no reconfiguration | $25,000 |
| Aug 16, 2002 | Completed final sign-off May 2003 | 393 Crescent Av | add stall shower to downstairs bathDetails
add stall shower to downstairs bath | $1,500 |
| Apr 25, 2002 | Never finaled issued Apr 2002, no final | 55 Rosewood Dr | remodel master bathroom install new shower pan, tub toilet, vanity, tileDetails
remodel master bathroom install new shower pan, tub toilet, vanity, tile | $30,000 |
| Mar 25, 2002 | Expired or cancelled expired Mar 2005 | 263 Crescent Av | remodel kit, relocate & remodel bath, add stairs from 1st flr to lower level, enclose & rear below 2Details
remodel kit, relocate & remodel bath, add stairs from 1st flr to lower level, enclose & rear below 2 | $80,000 |
| Nov 16, 2001 | Completed final sign-off Apr 2003 | 393 Crescent Av | add master bedroom&bath under(e)kitchen overhag,expand entry,add office in(e) storage area-grd floorDetails
add master bedroom&bath under(e)kitchen overhag,expand entry,add office in(e) storage area-grd floor | $50,000 |
| Jan 30, 2001 | Expired or cancelled expired Dec 2001 | 224 Acadia St | partial 3rd floor extension at rear above e 2nd fl, 3rd fl bathDetails
partial 3rd floor extension at rear above e 2nd fl, 3rd fl bath | $15,000 |