Devlin/Mcnally Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2007 to Aug 2026
- Last 24 months
- 13 permits filed
188 permits since 2000: 137 completed, 11 in progress, 24 never finaled, 16 expired or cancelled.
Of the 24 never-finaled permits, 2 are 3 to 5 years old, 8 are 5 to 10 years old, 14 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
21 stairs permits: 14 completed, 2 in progress, 4 never finaled, 1 expired or cancelled. Typically 55 days from filing to permit and 377 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 23, 2026 | In progress issued Jun 2026 | 2329 North Point St | new roof deck, stair, and retractable skylight.Details
new roof deck, stair, and retractable skylight. | $80,000 |
| Aug 1, 2025 | In progress issued Sep 2025 | 42 Clipper St | revision to 201912190060 and 2022-1025-5153- omit roof deck , stair to roof exterior balconies at level 3. revised enegery calculations. layout and glazing changes throughout.Details
revision to 201912190060 and 2022-1025-5153- omit roof deck , stair to roof exterior balconies at level 3. revised enegery calculations. layout and glazing changes throughout. | |
| Dec 18, 2023 | Completed final sign-off Mar 2025 | 370 De Haro St | #8: interior remodel of extg loft consisting of this remodel of the kitchen, 2 bathrooms, the relocation of the interior stair and a partial of the loft area as well as various buildings.Details
#8: interior remodel of extg loft consisting of this remodel of the kitchen, 2 bathrooms, the relocation of the interior stair and a partial of the loft area as well as various buildings. | $250,000 |
| Jul 19, 2022 | Completed final sign-off Dec 2023 | 320 Liberty St | repair, replace, reclad decking, railing, stair threads/risers. side rear property line perimeter fence. no structural scope.Details
repair, replace, reclad decking, railing, stair threads/risers. side rear property line perimeter fence. no structural scope. | $10,000 |
| Dec 19, 2019 | Never finaled issued Apr 2022, no final | 42 Clipper St | renovation & addition to single house, all work remain w/i existing bldg footprint, convert garage to habilitable space, 690 gsf horizontal addition to 3rd fl, add roodeck w/shade structure, add solar panel, balcony at front facade, interior stair, exterior landscapestair to meet cbc.Details
renovation & addition to single house, all work remain w/i existing bldg footprint, convert garage to habilitable space, 690 gsf horizontal addition to 3rd fl, add roodeck w/shade structure, add solar panel, balcony at front facade, interior stair, exterior landscapestair to meet cbc. | $750,000 |
| Aug 15, 2019 | Completed final sign-off Dec 2019 | 4276 26th St | reclad exterior stairs (front), new railing, posts, balusters step tile claddingDetails
reclad exterior stairs (front), new railing, posts, balusters step tile cladding | $5,000 |
| Mar 25, 2019 | Completed final sign-off Feb 2023 | 3975 19th St | (n) roof deck, (n) interior stair & sliding roof hatch for access, (n) larger sliding glass doors at north elevation, (n) larger p.l. windows at east elevation. no change to bldg envelope.Details
(n) roof deck, (n) interior stair & sliding roof hatch for access, (n) larger sliding glass doors at north elevation, (n) larger p.l. windows at east elevation. no change to bldg envelope. | $126,000 |
| Jul 2, 2018 | Completed final sign-off Mar 2021 | 130 Newman St | renovate (e) attic, adding (n) stair, master bath & skylights. build (n) first flr guest suite & laundry inside garage & under (e) dining room & deck. renovate (e) second flr dining room & deck.Details
renovate (e) attic, adding (n) stair, master bath & skylights. build (n) first flr guest suite & laundry inside garage & under (e) dining room & deck. renovate (e) second flr dining room & deck. | $435,000 |
| Jul 27, 2017 | Completed final sign-off Dec 2017 | 848 Bay St | revision to pa #201602099116-s1: elevatpr shaft at roof has increase from 9'-6" to 10'-6" above roof due to elevator equipment. glass canopy at stair trellis is being replaced with new glass. (e) lighting at roof deck is being upgraded to led. (e) outdoor case work is being replaced/ expanded.Details
revision to pa #201602099116-s1: elevatpr shaft at roof has increase from 9'-6" to 10'-6" above roof due to elevator equipment. glass canopy at stair trellis is being replaced with new glass. (e) lighting at roof deck is being upgraded to led. (e) outdoor case work is being replaced/ expanded. | $20,000 |
| Jun 8, 2017 | Completed final sign-off Jan 2019 | 609 Elizabeth St | 1st floor - convert portion of (e) garage into future office (under pa 201610059566), add 1 bathroom, add (n) interior stair to 2nd floor; 2nd floor - renovate (e) kitchen. remove dining room wall; 3rd floor - 2 (n) windows @ rear facade. general plumbing & electrical work as required throughoutDetails
1st floor - convert portion of (e) garage into future office (under pa 201610059566), add 1 bathroom, add (n) interior stair to 2nd floor; 2nd floor - renovate (e) kitchen. remove dining room wall; 3rd floor - 2 (n) windows @ rear facade. general plumbing & electrical work as required throughout | $50,000 |
| Oct 5, 2016 | Completed final sign-off Jan 2019 | 609 Elizabeth St | 1st flr- rear addn. @ ground flr. to include new office, new ext, sliding doors, 2nd flr- remove(e) rear bump-out, deck + exterior stair. new rear deck, new folding drs to deck. 3rd flr-no work. general plumbing + electrical work as required throughout.Details
1st flr- rear addn. @ ground flr. to include new office, new ext, sliding doors, 2nd flr- remove(e) rear bump-out, deck + exterior stair. new rear deck, new folding drs to deck. 3rd flr-no work. general plumbing + electrical work as required throughout. | $130,000 |
| Dec 14, 2015 | Never finaled issued Jan 2016, no final | 4038 23rd St | restore e finish at entry stairs to woodDetails
restore e finish at entry stairs to wood | $3,500 |
| Oct 22, 2015 | Completed final sign-off Aug 2017 | 1885 Mission St | 1,2&3 fls. reloc main entrance fr corner of 15 st&mission st,to be loc on mission st.new exterior garage doors,door& window on east facade.new non-stru int partions all 3 fls-new wood int stair in(e)fl opening fr 1st-2nd fl w/rated enclosure@2/fl.new stair fr 2nd-3rd fl in(e)open.Details
1,2&3 fls. reloc main entrance fr corner of 15 st&mission st,to be loc on mission st.new exterior garage doors,door& window on east facade.new non-stru int partions all 3 fls-new wood int stair in(e)fl opening fr 1st-2nd fl w/rated enclosure@2/fl.new stair fr 2nd-3rd fl in(e)open. | $50,000 |
| Sep 16, 2015 | Completed final sign-off Aug 2017 | 1885 Mission St | comply w/nov 201302222, core and shell upgrade of unoccupied bldg. 1) new accessible kitchen/bathrm construction at three floors; 2) new voluntary structural strengthening at three floors; 3) holes cut in 2nd & 3rd floors for future stairs - design build by owner/tenant improvementDetails
comply w/nov 201302222, core and shell upgrade of unoccupied bldg. 1) new accessible kitchen/bathrm construction at three floors; 2) new voluntary structural strengthening at three floors; 3) holes cut in 2nd & 3rd floors for future stairs - design build by owner/tenant improvement | $350,000 |
| Jun 3, 2015 | Completed final sign-off May 2016 | 461 02nd St | #457 - interior remodel - renovated bathrooms & kitchen. new finsihes throughout, relocate stair & electrical outlets throughout. relocate sprinklers under separate permit. n/a maher ordinanceDetails
#457 - interior remodel - renovated bathrooms & kitchen. new finsihes throughout, relocate stair & electrical outlets throughout. relocate sprinklers under separate permit. n/a maher ordinance | $75,000 |
| Mar 6, 2015 | Expired or cancelled expired Sep 2016 | 4038 23rd St | revision to app#201404304535.1)revision to floor layout at 1st floor. addition of occupiable attic space and new stair from 3rd floor to attic. 2)new dormers. 3) sprinklers per nfpa 13r to be filed under seperate permit.Details
revision to app#201404304535.1)revision to floor layout at 1st floor. addition of occupiable attic space and new stair from 3rd floor to attic. 2)new dormers. 3) sprinklers per nfpa 13r to be filed under seperate permit. | $80,000 |
| Nov 12, 2014 | Never finaled issued Aug 2015, no final | 4038 23rd St | (n) exterior rear yard stairDetails
(n) exterior rear yard stair | $5,000 |
| Nov 6, 2012 | Completed final sign-off Jul 2013 | 333 Oak Park Dr | interior remodel of extg lower floor. remodel bathroom, , bedroom and stair.Details
interior remodel of extg lower floor. remodel bathroom, , bedroom and stair. | $40,000 |
| May 4, 2012 | Completed final sign-off Jul 2012 | 101 Harrison St | unit #119 - remove existing interior mezzanine guardrail at stair & replace with drywall & 1/2 tempered glass to exisitng structural metal posts at 42" high.Details
unit #119 - remove existing interior mezzanine guardrail at stair & replace with drywall & 1/2 tempered glass to exisitng structural metal posts at 42" high. | $4,000 |
| Sep 3, 2010 | Completed final sign-off Mar 2011 | 1054 Haight St | rear bldg - remodel of 2 level unit to include: remodel (e) kitchen, (e) master bath, replace stair rail, replace 2 exterior doors, (n) plumbing & electrical in area of work.Details
rear bldg - remodel of 2 level unit to include: remodel (e) kitchen, (e) master bath, replace stair rail, replace 2 exterior doors, (n) plumbing & electrical in area of work. | $125,000 |
| Jan 28, 2010 | Never finaled issued Jan 2010, no final | 192 Laidley St | complaint # 200924342 dated 10/14/09-repair (e) exterior stair & (e) exterior walkway in kind to comply with novDetails
complaint # 200924342 dated 10/14/09-repair (e) exterior stair & (e) exterior walkway in kind to comply with nov | $1,000 |