Design Line Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2003 to Sep 2026
- Last 24 months
- 13 permits filed
224 permits since 2000: 149 completed, 8 in progress, 36 never finaled, 31 expired or cancelled.
Of the 36 never-finaled permits, 2 are 3 to 5 years old, 8 are 5 to 10 years old, 26 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Roof deck permits
7 roof deck permits: 6 completed, 1 never finaled. Typically 132 days from filing to permit and 866 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 19, 2024 | Completed final sign-off Sep 2024 | 166 Woodland Av | revision to pa 201904047179 layout changes, permitted roof deck removed, added windowDetails
revision to pa 201904047179 layout changes, permitted roof deck removed, added window | $1,500 |
| Oct 16, 2019 | Completed final sign-off Mar 2023 | 2467 Pacific Av | renovation of 4 story over basement multi-family res bldg @ 2467 pacific av. the use remains unchanged as a 2 unit res bldg. modifications include renovate of all floors, (n) garage at basement level and elevator to 1st fl, new dormer, addition of 3 bathrooms, new roof deck at 4th levelDetails
renovation of 4 story over basement multi-family res bldg @ 2467 pacific av. the use remains unchanged as a 2 unit res bldg. modifications include renovate of all floors, (n) garage at basement level and elevator to 1st fl, new dormer, addition of 3 bathrooms, new roof deck at 4th level | $150,000 |
| Apr 4, 2019 | Completed final sign-off Sep 2024 | 166 Woodland Av | renovation of (e) single family dwelling to include: interior renovation @ all floors, conversion of garage to finished basement, rear horizontal addition @ level 1 & basement, (n) green roof, (n) roof deck @ 2nd level.Details
renovation of (e) single family dwelling to include: interior renovation @ all floors, conversion of garage to finished basement, rear horizontal addition @ level 1 & basement, (n) green roof, (n) roof deck @ 2nd level. | $1,100,000 |
| May 11, 2015 | Completed final sign-off Oct 2016 | 3565 Washington St | new operable skylight & stairs to new roof deck & interior millwork.Details
new operable skylight & stairs to new roof deck & interior millwork. | $40,000 |
| Jul 14, 2014 | Never finaled issued Apr 2019, no final | 350 Hill St | vertical addition for a new stair penthouse & roof deck to be built on (e) roof of home, + new interior stair, to connect 3rd floor to roof. roof deck will be wood deck 312 sqft.Details
vertical addition for a new stair penthouse & roof deck to be built on (e) roof of home, + new interior stair, to connect 3rd floor to roof. roof deck will be wood deck 312 sqft. | $35,000 |
| Jul 26, 2013 | Completed final sign-off Apr 2015 | 150 Carmel St | interior remodel, structural repairs & upgrades. remove (e) roof deck, remodel bedroom & stairs @ ground floor. remodel kitchen & bath @ 2/f. shotcrete basement wall. remove existing non permitted improvements on roof and to infill existing interior lightwell.Details
interior remodel, structural repairs & upgrades. remove (e) roof deck, remodel bedroom & stairs @ ground floor. remodel kitchen & bath @ 2/f. shotcrete basement wall. remove existing non permitted improvements on roof and to infill existing interior lightwell. | $50,000 |
| Feb 27, 2012 | Completed final sign-off Dec 2016 | 25 Belgrave Av | remodel & horizonal addition to include: (n) basement with 2 car garage beneath (e) 1st floor. 1st flr: remodel for (n) media rm. 2nd flr: remodel living spaces. 3rd flr: remodel bedrm & bath. roof: (n) roof deck & stair penthouse.Details
remodel & horizonal addition to include: (n) basement with 2 car garage beneath (e) 1st floor. 1st flr: remodel for (n) media rm. 2nd flr: remodel living spaces. 3rd flr: remodel bedrm & bath. roof: (n) roof deck & stair penthouse. | $400,000 |