Permit GraphShortlistSan Francisco building permits since 2000

Dephillips Flooring

Contractor license
450110
State license record
Based in
Novato
On San Francisco permits
Mar 2010 to Mar 2010
Last 24 months
0 permits filed

1 permit since 2000: 1 never finaled.

Of the 1 never-finaled permit, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllBathroom remodel 1

1 bathroom remodel permit: 1 never finaled. Typically 0 days from filing to permit.

FiledOutcomeAddressWork described on the permitDeclared cost
Mar 1, 2010Never finaled
issued Mar 2010, no final
2031 Anza Stremove and replace wall and floor tile. remove & replace 1 recessed light,change to led. install gfi at vanity fixture. remove & replace vanity sink, fixture, bath tub & fixture, toilet 7 replace with low flush
Details
Permit
201003017282
Status
issued
Filed
Mar 1, 2010
Permit issued
Mar 1, 2010
Declared cost
$9,000
Address
2031 Anza St

remove and replace wall and floor tile. remove & replace 1 recessed light,change to led. install gfi at vanity fixture. remove & replace vanity sink, fixture, bath tub & fixture, toilet 7 replace with low flush

Open the permit page

$9,000