Back to bathroom remodel contractors
Deo Construction Inc
- Based in
- National City
- On San Francisco permits
- Nov 2016 to Dec 2019
- Last 24 months
- 0 permits filed
17 permits since 2000: 13 completed, 4 never finaled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 5 completed, 2 never finaled. Typically 0 days from filing to permit and 313 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 5, 2019 | Completed final sign-off Jan 2021 | 148 Cervantes Bl | front exterior stucco repair. interior remodel: replace garage beam, remodel ground floor bath and new first floor half bath. remodel kitchen. relocate gas meter. infill lightwell at 3rd flr. voluntary seismic strenghthening.Details
front exterior stucco repair. interior remodel: replace garage beam, remodel ground floor bath and new first floor half bath. remodel kitchen. relocate gas meter. infill lightwell at 3rd flr. voluntary seismic strenghthening. | $88,000 |
| Sep 16, 2019 | Completed final sign-off Dec 2020 | 148 Cervantes Bl | hallway and master bathroom remodel (not changing layout), new roof, water heater, furnace & ac. upgrade electrical service from 150 to 200amp.Details
hallway and master bathroom remodel (not changing layout), new roof, water heater, furnace & ac. upgrade electrical service from 150 to 200amp. | $90,000 |
| Feb 15, 2019 | Completed final sign-off Aug 2019 | 1980 Vallejo St | unit 1. remodel kitchen and bath. replace 1 windows, keeping same size and material on. replacing living-dining window and bath windows.Details
unit 1. remodel kitchen and bath. replace 1 windows, keeping same size and material on. replacing living-dining window and bath windows. | $60,000 |
| Feb 11, 2019 | Completed final sign-off Oct 2019 | 152 Cervantes Bl | remodel master bathroom, no change to layouts. no structural work.Details
remodel master bathroom, no change to layouts. no structural work. | $30,000 |
| Feb 7, 2018 | Completed final sign-off Dec 2018 | 2170 Jackson St | unit 4: kitchen & laundry room remodel, no walls to be removed, demo half bathDetails
unit 4: kitchen & laundry room remodel, no walls to be removed, demo half bath | $125,000 |
| Sep 6, 2017 | Never finaled issued Sep 2017, no final | 172 Burlwood Dr | removel bathroom: new plumbing, new bathroom fixtures and prelace lighting fixtures. 200a service panel upgrade.Details
removel bathroom: new plumbing, new bathroom fixtures and prelace lighting fixtures. 200a service panel upgrade. | $30,000 |
| Nov 28, 2016 | Never finaled issued Nov 2016, no final | 35 Dolores St | bathroom remodel. remove (e) tub; install new shower pan, rough plumbing on 2nd shower head. remove single vanity.add additional plumbing for double vainty. remove pocket door,add add'l recessed light above shower.remove over the mirrow light and add 2 sconce, repair/patch drywall and paint.Details
bathroom remodel. remove (e) tub; install new shower pan, rough plumbing on 2nd shower head. remove single vanity.add additional plumbing for double vainty. remove pocket door,add add'l recessed light above shower.remove over the mirrow light and add 2 sconce, repair/patch drywall and paint. | $12,000 |