Denluc Construction Inc
- Based in
- Fairfield
- On San Francisco permits
- Mar 2025 to Aug 2025
- Last 24 months
- 2 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2025 | Completed final sign-off Aug 2025 | 1500 Broadway | revision to permit 202503192531. change (e) entry door in (e) opening to single leaf. see original permit for accessibility features. add power door operator.Details
revision to permit 202503192531. change (e) entry door in (e) opening to single leaf. see original permit for accessibility features. add power door operator. | |
| Mar 19, 2025 | Completed final sign-off Aug 2025 | 1500 Broadway | tenant improvement to replace existing bar and interior finishes, including deilings, flooring, bar appliances. existing type 1 kitchen, storage and accessible restrooms to remain. replace e alum windows w similar in e openings. replace entry door w new wood door and sidelight. no change in floor arDetails
tenant improvement to replace existing bar and interior finishes, including deilings, flooring, bar appliances. existing type 1 kitchen, storage and accessible restrooms to remain. replace e alum windows w similar in e openings. replace entry door w new wood door and sidelight. no change in floor ar | $550,000 |