Denali Building Improvement Llc
- Based in
- Sausalito
- On San Francisco permits
- Mar 2026 to Nov 2026
- Last 24 months
- 2 permits filed
2 permits since 2000: 1 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 9, 2026 | In progress issued Nov 2026 | 741 30th Av | remove approx. 418 sq ft of existing ceiling assembly (button board and plaster) and install 5/8" gypsum board ceiling. tope, mud, sound and finish to level 4. no structural alteration. existing ceiling framing to remain.Details
remove approx. 418 sq ft of existing ceiling assembly (button board and plaster) and install 5/8" gypsum board ceiling. tope, mud, sound and finish to level 4. no structural alteration. existing ceiling framing to remain. | $4,500 |
| Mar 27, 2026 | Completed final sign-off Jul 2026 | 48 Dawnview Wy | bathroom remodel, in kind. tile replacement in bathroom - floor and walls.Details
bathroom remodel, in kind. tile replacement in bathroom - floor and walls. | $7,000 |