Back to bathroom remodel contractors
Delsur Construction
- Based in
- South San Francisco
- On San Francisco permits
- Feb 2011 to Jul 2025
- Last 24 months
- 1 permit filed
46 permits since 2000: 34 completed, 1 in progress, 3 never finaled, 8 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 16 completed, 2 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 103 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 15, 2023 | Never finaled issued Sep 2023, no final | 4351 17th St | one bathroom remodel like for like. non structural.Details
one bathroom remodel like for like. non structural. | $14,000 |
| Jul 14, 2023 | Completed final sign-off Apr 2024 | 170 Pacific Av | unit# 25: remodel 1-kitchen, 3-bathrooms, & 1-laundry within single family condo, replace flooring throughout. new & replaced electrical. structural headers. no exterior work.Details
unit# 25: remodel 1-kitchen, 3-bathrooms, & 1-laundry within single family condo, replace flooring throughout. new & replaced electrical. structural headers. no exterior work. | $100,000 |
| Mar 19, 2018 | Completed final sign-off Jul 2018 | 870 47th Av | unit 1 and 4: remodel bathroom, install recessed lights, replace entry door, update supanel unit 1. size of bath 5x8Details
unit 1 and 4: remodel bathroom, install recessed lights, replace entry door, update supanel unit 1. size of bath 5x8 | $30,882 |
| Mar 19, 2018 | Completed final sign-off Jul 2018 | 874 47th Av | unit 2,3, 4: remodel bathroom, install recessed lights, eplace entry doors, update subpanel in un its 3,4. size of bath 5x8Details
unit 2,3, 4: remodel bathroom, install recessed lights, eplace entry doors, update subpanel in un its 3,4. size of bath 5x8 | $44,823 |
| Oct 11, 2017 | Completed final sign-off Jul 2018 | 184 Marietta Dr | revision to pa #201511031627 to modify residential unit previously legalized per pa#201511031627 on the ground fl. add back storage, move laundry, furnace,water heater, add wastebins. 2 units in bldg, one to complete legalization per ordinance# 43-14. nook,bathroom & closet to remain the same place.Details
revision to pa #201511031627 to modify residential unit previously legalized per pa#201511031627 on the ground fl. add back storage, move laundry, furnace,water heater, add wastebins. 2 units in bldg, one to complete legalization per ordinance# 43-14. nook,bathroom & closet to remain the same place. | |
| Jul 28, 2017 | Completed final sign-off Sep 2017 | 520 Page St | remodel bath, replace fixtures like for like. remodel kitchen, cabinets, countertop, appliances, add recessed lights throughout all lights ledDetails
remodel bath, replace fixtures like for like. remodel kitchen, cabinets, countertop, appliances, add recessed lights throughout all lights led | $30,000 |
| Jun 30, 2017 | Completed final sign-off Sep 2017 | 516 Page St | remodel bathroom: replace all fixtures like for like. all lights led. remodel kitchen: replace cabinets, countertop and appliances. add 26 recessed lights through out. all lights led. no alteration of wall, window and door.Details
remodel bathroom: replace all fixtures like for like. all lights led. remodel kitchen: replace cabinets, countertop and appliances. add 26 recessed lights through out. all lights led. no alteration of wall, window and door. | $20,000 |
| Jul 13, 2016 | Completed final sign-off Apr 2017 | 333 Bush St | unit#4006 kitchen and bathroom remodel, move laundry to hallway, add new fireplace accent to living room. add 42 recess led lights, replace subpanel for unit, shower pan.Details
unit#4006 kitchen and bathroom remodel, move laundry to hallway, add new fireplace accent to living room. add 42 recess led lights, replace subpanel for unit, shower pan. | $35,000 |
| Nov 3, 2015 | Completed final sign-off Jul 2018 | 184 Marietta Dr | comply w/nov #201573182 -legalize (e) 2 bedrooms & bath @ ground floor. rewire elect, replace duct work, old insulation w/new, hardwood floors. repaint int./exterior sheetrock/toptile install. full kitchen remodel, replace (e) bathroom w/new vanities/tub. install 3 closets in rooms, window additn.Details
comply w/nov #201573182 -legalize (e) 2 bedrooms & bath @ ground floor. rewire elect, replace duct work, old insulation w/new, hardwood floors. repaint int./exterior sheetrock/toptile install. full kitchen remodel, replace (e) bathroom w/new vanities/tub. install 3 closets in rooms, window additn. | $90,000 |
| Jan 27, 2015 | Never finaled issued Jan 2015, no final | 4145 20th St | upgrade main electric service to 100 amp unit #4145-4147 20th street. new subpanel in garage, remodel kitchen, bathroom, install new washer and dryer hookup in bathroom, convert bathtub to shower, update electrical for kitchen and bathroom. interior remodel in 4147 20th street(lower unit)Details
upgrade main electric service to 100 amp unit #4145-4147 20th street. new subpanel in garage, remodel kitchen, bathroom, install new washer and dryer hookup in bathroom, convert bathtub to shower, update electrical for kitchen and bathroom. interior remodel in 4147 20th street(lower unit) | $50,000 |
| Jan 31, 2014 | Completed final sign-off Mar 2014 | 1710 Quint St | revision to app#201401277170 legalizing a bathroom at ground floor. replace window.Details
revision to app#201401277170 legalizing a bathroom at ground floor. replace window. | |
| Jan 27, 2014 | Completed final sign-off Mar 2014 | 1710 Quint St | downstair bathroom remodel: move vanity to opposite wall, new circuit to bathroom, replace window 36x36, new tud, no new walls no structural workDetails
downstair bathroom remodel: move vanity to opposite wall, new circuit to bathroom, replace window 36x36, new tud, no new walls no structural work | $6,000 |
| Nov 13, 2013 | Completed final sign-off Mar 2014 | 1710 Quint St | remodel bathroom and kitchen like for like. add 5 circuits for the kitchen and bathroom fan, 10 new recess lighting in living room and dining room, kitchen min 50% of total wttage = high efficacy lighting; bathroom - lighting shall be high efficacy or controlled by manual sensorsDetails
remodel bathroom and kitchen like for like. add 5 circuits for the kitchen and bathroom fan, 10 new recess lighting in living room and dining room, kitchen min 50% of total wttage = high efficacy lighting; bathroom - lighting shall be high efficacy or controlled by manual sensors | $15,000 |
| Aug 20, 2013 | Completed final sign-off Oct 2013 | 300 03rd St | kitchen remodel and bathroom remodel. no structural.Details
kitchen remodel and bathroom remodel. no structural. | $12,000 |
| Jun 27, 2013 | Expired or cancelled cancelled Nov 2018 | 767 Cayuga Av | (n) ground floor master bedroom and bath, (n) stairs renovation of 2nd floor kitchen .partial excavation at rear of first floor with new foundation and framing.new retaining wall. new skylight.Details
(n) ground floor master bedroom and bath, (n) stairs renovation of 2nd floor kitchen .partial excavation at rear of first floor with new foundation and framing.new retaining wall. new skylight. | $80,000 |
| Apr 29, 2013 | Completed final sign-off Jun 2013 | 420 Mission Bay Blvd North Bl | repair sheetrock damage from water in unit above. replace sheetrock in living room and bathroom 2'x31' at bottom of wall.Details
repair sheetrock damage from water in unit above. replace sheetrock in living room and bathroom 2'x31' at bottom of wall. | $5,000 |
| Jan 22, 2013 | Completed final sign-off May 2013 | 379 Winding Wy | kitchen and bath remodel, like for like, appliances and plumbing location.Details
kitchen and bath remodel, like for like, appliances and plumbing location. | $14,000 |
| Dec 6, 2012 | Completed final sign-off Jun 2013 | 745 Moultrie St | add bedroom and bathroom in garage storage area. replace 1 window on rear of house. replace furnace, water heater, remodel existing kitchen and bath, upgrade electrical panel to 100 amp service, rewire outlets and lightsDetails
add bedroom and bathroom in garage storage area. replace 1 window on rear of house. replace furnace, water heater, remodel existing kitchen and bath, upgrade electrical panel to 100 amp service, rewire outlets and lights | $60,000 |
| May 8, 2012 | Completed final sign-off Jun 2012 | 369 Baltimore Wy | comply with nov 200711544: gr floor remove illegal kitchen, convert 2 bedrooms to storage, legalize full bath. 1st fl: kitchen and bath remodel, no wall changes. replace windows, visible from street.Details
comply with nov 200711544: gr floor remove illegal kitchen, convert 2 bedrooms to storage, legalize full bath. 1st fl: kitchen and bath remodel, no wall changes. replace windows, visible from street. | $22,000 |
| Apr 13, 2012 | Expired or cancelled cancelled Oct 2012 | 566 16th Av | 1 kitchen and 1 bathroom remodel, like for like. to comply with cec (150)kDetails
1 kitchen and 1 bathroom remodel, like for like. to comply with cec (150)k | $22,000 |