Back to bathroom remodel contractors
Delija Construction
- Based in
- Brookdale
- On San Francisco permits
- Aug 2010 to Mar 2015
- Last 24 months
- 0 permits filed
8 permits since 2000: 4 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 73 days from filing to permit and 544 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 23, 2015 | Completed final sign-off Feb 2016 | 1019 Minnesota St | demo kitchen and bath cabinets/counters. no walls to be moved. no structural work - finishes and fixtures. fire rated assemblies to be maintained.Details
demo kitchen and bath cabinets/counters. no walls to be moved. no structural work - finishes and fixtures. fire rated assemblies to be maintained. | $15,000 |
| Aug 17, 2010 | Completed final sign-off Feb 2013 | 88 Westgate Dr | interior remodel, conversion of unconditioned crawl space to conditioned living space in lower fl including one new full bathroom in lower floor, and 1 full bath and a powder room in 2nd floor. no change to building height , width or depth of the building.Details
interior remodel, conversion of unconditioned crawl space to conditioned living space in lower fl including one new full bathroom in lower floor, and 1 full bath and a powder room in 2nd floor. no change to building height , width or depth of the building. | $153,000 |