Back to bathroom remodel contractors
Delaney Construction
- Based in
- El Granada
- On San Francisco permits
- Feb 2019 to Mar 2019
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 621 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 7, 2019 | Completed final sign-off Nov 2020 | 1375 18th Av | unit 2: remove/replace existing kitchen cabinets, counters, and appliances. remove/replace existing tub and sourround, vanity, and flooring. add can lighting in kitchen, living room, and hallway. replace flooring throughout. replace and move electrical panel. kitchen: 100 sqft. bathroom: 40 sqft.Details
unit 2: remove/replace existing kitchen cabinets, counters, and appliances. remove/replace existing tub and sourround, vanity, and flooring. add can lighting in kitchen, living room, and hallway. replace flooring throughout. replace and move electrical panel. kitchen: 100 sqft. bathroom: 40 sqft. | $21,000 |