Back to bathroom remodel contractors
Del Rey Construction Inc
- Based in
- San Mateo
- On San Francisco permits
- Jan 2000 to Jul 2023
- Last 24 months
- 0 permits filed
44 permits since 2000: 31 completed, 5 never finaled, 8 expired or cancelled.
Of the 5 never-finaled permits, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 3 completed, 1 never finaled, 1 expired or cancelled. Typically 3 days from filing to permit and 118 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 10, 2023 | Completed final sign-off Nov 2023 | 1710 Castro St | renovate kitchen-new cabinets, new lighting, remove post & wall in kitchen, replace with beams, bathroom-new tile, remove bath door.Details
renovate kitchen-new cabinets, new lighting, remove post & wall in kitchen, replace with beams, bathroom-new tile, remove bath door. | $55,000 |
| Jun 5, 2015 | Completed final sign-off Jan 2016 | 643 Divisadero St | tenant shell improvements, new partitions, clng, temporary/reuse (e) lighting, new elect sub panels, new gas stub outs, 20% ada upgrade to (e) bathroom, demolition under separate permit 201504244556.Details
tenant shell improvements, new partitions, clng, temporary/reuse (e) lighting, new elect sub panels, new gas stub outs, 20% ada upgrade to (e) bathroom, demolition under separate permit 201504244556. | $50,000 |
| Jul 8, 2011 | Never finaled issued Jul 2011, no final | 448 Fair Oaks St | new bathroom in upper unit #448. remove two bearing walls & replace with beams, per plans.Details
new bathroom in upper unit #448. remove two bearing walls & replace with beams, per plans. | $18,000 |
| Jun 27, 2007 | Completed final sign-off Oct 2007 | 1864 Fell St | widening door wall, installing new half bath with washer and dryer in basement.Details
widening door wall, installing new half bath with washer and dryer in basement. | $55,000 |
| Jan 9, 2007 | Expired or cancelled expired Jan 2010 | 2224 Mission St | upgrade existing bathrooms with new toilets, sinks, mirrors, crab bars. install new door closures, new handicap accessible fixtures in both bathrooms, new hc stripe area in existing parking lot. no change in front door swings.Details
upgrade existing bathrooms with new toilets, sinks, mirrors, crab bars. install new door closures, new handicap accessible fixtures in both bathrooms, new hc stripe area in existing parking lot. no change in front door swings. | $1,800 |