Back to bathroom remodel contractors
Deep Elm Construction Llc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2016 to Sep 2026
- Last 24 months
- 27 permits filed
83 permits since 2000: 49 completed, 14 in progress, 11 never finaled, 9 expired or cancelled.
Of the 11 never-finaled permits, 5 are 3 to 5 years old, 6 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
37 bathroom remodel permits: 22 completed, 7 in progress, 5 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 288 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 25, 2026 | In progress issued Aug 2026 | 297 Richland Av | rear building remodel, (1) kitchen and (2) bathrooms in kind. exploratory demolition approx 10'x20' to repair dry rot and water damage, patch in-kind. replace (6) windows in existing historic details. update plumbing and electrical as needed.Details
rear building remodel, (1) kitchen and (2) bathrooms in kind. exploratory demolition approx 10'x20' to repair dry rot and water damage, patch in-kind. replace (6) windows in existing historic details. update plumbing and electrical as needed. | $20,000 |
| Aug 24, 2026 | In progress issued Aug 2026 | 297 Richland Av | replace 1 kitchen and 1 bathroom in kind. exploratory demo approx 15'x20' for dry rot and water damage repairs. replace 8 windows in kind with wood sash windows to match existing historic detail. add 3 new skulights approx 24"x48" each, 5 feet from property line. update plumb. & elec as needed.Details
replace 1 kitchen and 1 bathroom in kind. exploratory demo approx 15'x20' for dry rot and water damage repairs. replace 8 windows in kind with wood sash windows to match existing historic detail. add 3 new skulights approx 24"x48" each, 5 feet from property line. update plumb. & elec as needed. | $30,000 |
| Aug 10, 2026 | In progress issued Aug 2026 | 942 Clayton St | bathroom remodel, replace in kind, no fixture move.Details
bathroom remodel, replace in kind, no fixture move. | $20,000 |
| Jun 26, 2026 | In progress filed Jun 2026, not yet issued | 3819 17th St | bathroom remodel. approximately 24sf. replace 3 windows in kind at lightwell. windows not visible from street. no slab replacement, no exploratory excavation. 6/26/26 azDetails
bathroom remodel. approximately 24sf. replace 3 windows in kind at lightwell. windows not visible from street. no slab replacement, no exploratory excavation. 6/26/26 az | $25,000 |
| Jun 3, 2026 | Completed final sign-off Jul 2026 | 245 Webster St | bathroom remodel, replace in kind. add shower in (e) bathroom, no change to walls.Details
bathroom remodel, replace in kind. add shower in (e) bathroom, no change to walls. | $15,000 |
| Mar 18, 2026 | In progress issued Mar 2026 | 172 Arguello Bl | bathroom remodel in kind. no wall removal.Details
bathroom remodel in kind. no wall removal. | $50,000 |
| Dec 16, 2025 | Completed final sign-off Mar 2026 | 480 Sanchez St | remodel of two full bathroom. no fixture moved.Details
remodel of two full bathroom. no fixture moved. | $40,000 |
| Sep 8, 2025 | Completed final sign-off Nov 2025 | 506 Divisadero St | unit 506 and 510: revision to bpa 202405283118, remodel 1 kitchen and 1 bath in unit 506, remodel 1 kitchen and 1 bath in unit 510.Details
unit 506 and 510: revision to bpa 202405283118, remodel 1 kitchen and 1 bath in unit 506, remodel 1 kitchen and 1 bath in unit 510. | |
| Aug 11, 2025 | Completed final sign-off Jan 2026 | 190 Noe St | bathroom remodel, new tub, sink vanity, floor and wall tiles.Details
bathroom remodel, new tub, sink vanity, floor and wall tiles. | $30,000 |
| Apr 29, 2025 | Completed final sign-off Apr 2026 | 1266 York St | comply/w nov 202429997. remodel 3 (e) apartments: remodel 3 kitchens, 3 bathrooms, add new laundry in each unit. add n) heating equipment to each unit.new framing & finishes to create n) bedroom & bathroom. repair/replace missing/damaged interior finishes. demo unpermitted deck & replace w/ (n) deckDetails
comply/w nov 202429997. remodel 3 (e) apartments: remodel 3 kitchens, 3 bathrooms, add new laundry in each unit. add n) heating equipment to each unit.new framing & finishes to create n) bedroom & bathroom. repair/replace missing/damaged interior finishes. demo unpermitted deck & replace w/ (n) deck | $170,000 |
| Nov 15, 2024 | Completed final sign-off May 2025 | 1871 Bush St | unit #1871: remodel 1 bathroom in kind. unit 1873: remodel 1 bathroom in kind, remodel 1 kitchen in kind. unit #1871 & 1873: remodel laundry room in kind both units.Details
unit #1871: remodel 1 bathroom in kind. unit 1873: remodel 1 bathroom in kind, remodel 1 kitchen in kind. unit #1871 & 1873: remodel laundry room in kind both units. | $90,000 |
| Nov 15, 2024 | In progress issued Nov 2024 | 1400 La Playa | unit 9: remodel 1 bathroom & 1 kitchen in kind.Details
unit 9: remodel 1 bathroom & 1 kitchen in kind. | $50,000 |
| Oct 2, 2024 | Completed final sign-off Mar 2026 | 3824 21st St | remodel 1 bathroom in kind.Details
remodel 1 bathroom in kind. | $20,000 |
| Jul 22, 2024 | In progress filed Jul 2024, not yet issued | 506 Divisadero St | unit 506: remodel 1 kitchen & 2 bathrooms in kind. unit 510 remodel 1 kitchen & 2 bathrooms in kind. upgrade gas lines & water supply lines throughout as needed.Details
unit 506: remodel 1 kitchen & 2 bathrooms in kind. unit 510 remodel 1 kitchen & 2 bathrooms in kind. upgrade gas lines & water supply lines throughout as needed. | $100,000 |
| May 28, 2024 | Completed final sign-off Nov 2025 | 506 Divisadero St | unit 506 and unint 510: remodle 2 kitchens 4 baths in kindDetails
unit 506 and unint 510: remodle 2 kitchens 4 baths in kind | $100,000 |
| Mar 15, 2024 | Completed final sign-off Feb 2025 | 168 16th Av | interior remodel and structural upgrade. general interior remodel including kitchen and bath. remove/replace doors and windows to deck at 2/f, rear yard (not visible from prow)Details
interior remodel and structural upgrade. general interior remodel including kitchen and bath. remove/replace doors and windows to deck at 2/f, rear yard (not visible from prow) | $30,000 |
| Jan 12, 2024 | Completed final sign-off Jul 2024 | 1998 Vallejo St | revision to permit# 202310199066: for same work but to provide plans. (kitchen and bath remodel, electrical upgrades)Details
revision to permit# 202310199066: for same work but to provide plans. (kitchen and bath remodel, electrical upgrades) | $1,000 |
| Jan 11, 2024 | Completed final sign-off Jul 2024 | 1998 Vallejo St | apt 9: remodel 2 bathrooms, in-kind.Details
apt 9: remodel 2 bathrooms, in-kind. | $80,000 |
| Jan 11, 2024 | Completed final sign-off Dec 2024 | 1348 Vermont St | remodel 1 bathrooms, in-kind. no fixtures changes. change new fan, lighting. replace sink in toilet room.Details
remodel 1 bathrooms, in-kind. no fixtures changes. change new fan, lighting. replace sink in toilet room. | $20,000 |
| Oct 19, 2023 | Completed final sign-off Jul 2024 | 1998 Vallejo St | remodel kitchen in kind, remodel 3 bathrooms in kind. replace all radiators in kind. upgrade electrical throughoutDetails
remodel kitchen in kind, remodel 3 bathrooms in kind. replace all radiators in kind. upgrade electrical throughout | $40,000 |
| Jun 30, 2023 | Completed final sign-off Nov 2024 | 715 Ashbury St | revision to bpa#202302101835, relocate proposed new 3/f bathroom to new location on 3/f. convert one bedroom into office (on 3rd flr).Details
revision to bpa#202302101835, relocate proposed new 3/f bathroom to new location on 3/f. convert one bedroom into office (on 3rd flr). | |
| Dec 7, 2021 | Never finaled issued Dec 2021, no final | 1400 La Playa | unit #2: remodel kitchen & bathroom in kind.Details
unit #2: remodel kitchen & bathroom in kind. | $20,000 |
| Jul 20, 2021 | Never finaled issued Jul 2021, no final | 1552 Fulton St | remodel 2 kitchens and 4 baths in kindDetails
remodel 2 kitchens and 4 baths in kind | $102,700 |
| May 18, 2021 | Completed final sign-off Dec 2023 | 1180 Fulton St | replace one window about sink, not facing public. one in kind kitchen & 2 bath update: materials & appliances update in kind non structural.Details
replace one window about sink, not facing public. one in kind kitchen & 2 bath update: materials & appliances update in kind non structural. | $150,000 |
| Jan 8, 2021 | Expired or cancelled expired Jan 2024 | 148 29th St | remodel in kind of 1 bathroom remodel and main electrcial panel upgrade. no cnage to wall & opening, layout (maintain 1 hr separation between units at area of work).Details
remodel in kind of 1 bathroom remodel and main electrcial panel upgrade. no cnage to wall & opening, layout (maintain 1 hr separation between units at area of work). | $30,000 |
| Nov 10, 2020 | Never finaled issued Mar 2021, no final | 2381 Bush St | excavate & replace 1st fl brick foundation. partial excavation of rear yard to 1st fl. add new bathroom on 1st fl. add new stair from 1st to 2nd fl. partial removal of rear deck and reconfigure stair access to rear yard. legalize 698 habitable sq ft.Details
excavate & replace 1st fl brick foundation. partial excavation of rear yard to 1st fl. add new bathroom on 1st fl. add new stair from 1st to 2nd fl. partial removal of rear deck and reconfigure stair access to rear yard. legalize 698 habitable sq ft. | $78,000 |
| Oct 22, 2020 | Completed final sign-off Jan 2021 | 114 Clarendon Av | cosmetic bathroom remodel. change mediciene cabinet, and tiles. no structural work.Details
cosmetic bathroom remodel. change mediciene cabinet, and tiles. no structural work. | $10,000 |
| Feb 28, 2020 | Expired or cancelled cancelled Mar 2020 | 2130 Leavenworth St | apt 11. plumbing - bath remodel, toilet, sink, shower electrical - rewire bathroom for remodel.Details
apt 11. plumbing - bath remodel, toilet, sink, shower electrical - rewire bathroom for remodel. | $20,000 |
| Jan 10, 2020 | Completed final sign-off Nov 2021 | 2130 Leavenworth St | unit #11: bath remodel, replace in kind existing bathroom. new tile, fixtures and vanity. electrical and plumbing upgrade as needed. all high efficency lighting. no structural work. no layout changes. maintain 1 hour separation between units.Details
unit #11: bath remodel, replace in kind existing bathroom. new tile, fixtures and vanity. electrical and plumbing upgrade as needed. all high efficency lighting. no structural work. no layout changes. maintain 1 hour separation between units. | $20,000 |
| Jun 20, 2018 | Never finaled issued Dec 2018, no final | 1847 Mcallister St | additional dwelling per ord #162-17. add (1) studio dwelling unit @ 1st fl, add (1) bathroom, (1) kitchen. add doors & windows to rear elevation; add half bath in garage. sprinkler under separate permitDetails
additional dwelling per ord #162-17. add (1) studio dwelling unit @ 1st fl, add (1) bathroom, (1) kitchen. add doors & windows to rear elevation; add half bath in garage. sprinkler under separate permit | $75,000 |
| Jun 20, 2018 | Never finaled issued Jun 2018, no final | 1847 Mcallister St | full foundation replacement w/mat slab. interior stregthening of 3 out of 4 levels. including 3-story moments frame. structural work to conform to req ab094 and design criteria. new partitions in basement, interior remodel at fl 2 and 3. replace 11 win & (1)dr, remodel (2) baths & (1) kitc per flrDetails
full foundation replacement w/mat slab. interior stregthening of 3 out of 4 levels. including 3-story moments frame. structural work to conform to req ab094 and design criteria. new partitions in basement, interior remodel at fl 2 and 3. replace 11 win & (1)dr, remodel (2) baths & (1) kitc per flr | $200,000 |
| Apr 4, 2018 | Expired or cancelled cancelled Jan 2020 | 1851 Mcallister St | remodel 1 kitchen,(approx 200 sq ft) 1.5 bath ( 100 sq ft & 30 sq ft) add recessed lighting new hyronic heat, all luminaries high effeciency, provide smoke detectors & carbon menoxide hard wired lighitn per cec 150.kDetails
remodel 1 kitchen,(approx 200 sq ft) 1.5 bath ( 100 sq ft & 30 sq ft) add recessed lighting new hyronic heat, all luminaries high effeciency, provide smoke detectors & carbon menoxide hard wired lighitn per cec 150.k | $40,000 |
| Apr 4, 2018 | Completed final sign-off Jun 2018 | 233 Liberty St | remodel 1 bath new fixtures provide smoke & carbon monoxide hard wired, approx 5 recessed lights in hallway, all luminaries hi effeciency per cec 150.0k approx 70 sq ftDetails
remodel 1 bath new fixtures provide smoke & carbon monoxide hard wired, approx 5 recessed lights in hallway, all luminaries hi effeciency per cec 150.0k approx 70 sq ft | $15,000 |
| Jun 5, 2017 | Completed final sign-off Feb 2018 | 3833 17th St | kitchen and bath remodel. replace inkind. dry rot repair.Details
kitchen and bath remodel. replace inkind. dry rot repair. | $40,000 |
| Jun 22, 2016 | Completed final sign-off Apr 2017 | 152 29th St | remodel 2 baths and 1 kitchen, upgrade plumbing & electrical as needed. all high efficacy lighting. dryrot repair at westside of bldg, replace approx 100 sq ft siding, not visible from street.Details
remodel 2 baths and 1 kitchen, upgrade plumbing & electrical as needed. all high efficacy lighting. dryrot repair at westside of bldg, replace approx 100 sq ft siding, not visible from street. | $25,000 |
| Jan 25, 2016 | Completed final sign-off Aug 2018 | 36 Whitney St | exterior: at rear, add dormer in (e) roof, enlarge bathroom. deck: at rear, add w.p. roof deck & open railing @ roof. stair (interior): add new stair to garage @ front living level.Details
exterior: at rear, add dormer in (e) roof, enlarge bathroom. deck: at rear, add w.p. roof deck & open railing @ roof. stair (interior): add new stair to garage @ front living level. | $17,000 |
| Jan 11, 2016 | Completed final sign-off Dec 2016 | 3729 17th St | remodel (e) half bath in middle level unit, no change in wall & openings. replace toilet & vanity in kind. upgrade plumbing and electrical as needed by bldg codes. provide smoke/carbon monoxide and lighting in hallway. all high efficacy lighting.Details
remodel (e) half bath in middle level unit, no change in wall & openings. replace toilet & vanity in kind. upgrade plumbing and electrical as needed by bldg codes. provide smoke/carbon monoxide and lighting in hallway. all high efficacy lighting. | $15,000 |