Declan B Cassidy Constr. Co.
- Based in
- San Francisco
- On San Francisco permits
- May 2009 to Dec 2022
- Last 24 months
- 0 permits filed
19 permits since 2000: 17 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 2, 2022 | Completed final sign-off Jan 2024 | 2370 38th Av | gr fl relocate and renew e water heater and furnace. 2nd fl kitchen and bath remodel, convert 1/2 bath full, e bedrm remodel, replace window in kin not facing streetDetails
gr fl relocate and renew e water heater and furnace. 2nd fl kitchen and bath remodel, convert 1/2 bath full, e bedrm remodel, replace window in kin not facing street | $40,000 |
| Jul 5, 2019 | Completed final sign-off Aug 2019 | 22 Twin Peaks Bl | unit 3: kitchen remodel in kindDetails
unit 3: kitchen remodel in kind | $10,000 |
| Oct 15, 2018 | Completed final sign-off Jan 2022 | 1378 41st Av | add new bathroom and laundry at 1st floor. enclose inner light court at 2nd floorDetails
add new bathroom and laundry at 1st floor. enclose inner light court at 2nd floor | $115,000 |
| Aug 16, 2018 | Completed final sign-off Aug 2020 | 1378 41st Av | bathroom and kitchen remodel. demolition exploratory work, 250-300 sq ftDetails
bathroom and kitchen remodel. demolition exploratory work, 250-300 sq ft | $9,000 |
| Sep 22, 2017 | Completed final sign-off May 2021 | 1295 39th Av | soft story seismic retrofit per sfebc ch 4dDetails
soft story seismic retrofit per sfebc ch 4d | $75,000 |
| Jan 27, 2017 | Completed final sign-off May 2017 | 3236 Scott St | g/f- change of use from vacant retail to hair salon maher na; modify layout w/new mechanical & lighting.Details
g/f- change of use from vacant retail to hair salon maher na; modify layout w/new mechanical & lighting. | $30,000 |
| Oct 12, 2016 | Completed final sign-off Jan 2017 | 1976 15th St | handrails, smoke & monoxide alarms -10yr, exhaust hood kitchen, dbi corrections for condo conversion.Details
handrails, smoke & monoxide alarms -10yr, exhaust hood kitchen, dbi corrections for condo conversion. | $1,500 |
| Jul 27, 2015 | Completed final sign-off Jun 2016 | 1422 43rd Av | revision to app#201507101220. alteration of bathroom configuration.Details
revision to app#201507101220. alteration of bathroom configuration. | |
| Jul 10, 2015 | Completed final sign-off Jun 2016 | 1422 43rd Av | remodel top unit. relocate existing bath and kitchenDetails
remodel top unit. relocate existing bath and kitchen | $40,000 |
| Jul 10, 2014 | Never finaled issued Jul 2014, no final | 1293 28th Av | dry rot repair. replace patio door in kind. dry rot repair back patio door rear of building. replace some siding. repair deck where rot is.Details
dry rot repair. replace patio door in kind. dry rot repair back patio door rear of building. replace some siding. repair deck where rot is. | $5,500 |
| Jul 7, 2014 | Never finaled issued Jul 2014, no final | 1293 28th Av | kitchen remodel, lighting to comply with cec 150(k)Details
kitchen remodel, lighting to comply with cec 150(k) | $12,000 |
| Mar 24, 2014 | Completed final sign-off Feb 2015 | 2440 Great Hy | seismic strengthening for soft story ordinace sfbc 34b- at first floor/garage target story by adding 2 moment frames to a4Details
seismic strengthening for soft story ordinace sfbc 34b- at first floor/garage target story by adding 2 moment frames to a4 | $25,000 |
| Sep 13, 2013 | Completed final sign-off Jan 2014 | 2440 Great Hy | front facade winodw replacement, stucco repair - front facadeDetails
front facade winodw replacement, stucco repair - front facade | $5,600 |
| Sep 4, 2013 | Completed final sign-off Dec 2013 | 1422 43rd Av | install cabinets, install new flooring cork. sheetrock and insulation in exterior walls, venting of hood exhaust. no walls being added/moved, kitchen remodeling, no structural workDetails
install cabinets, install new flooring cork. sheetrock and insulation in exterior walls, venting of hood exhaust. no walls being added/moved, kitchen remodeling, no structural work | $5,500 |
| Aug 28, 2013 | Completed final sign-off Jan 2014 | 2440 Great Hy | comply with complaint #201320851-replacement of existing fire escape due to rust, same location, same configuration. repair & patch all plaster holesDetails
comply with complaint #201320851-replacement of existing fire escape due to rust, same location, same configuration. repair & patch all plaster holes | $16,000 |
| Aug 13, 2010 | Completed final sign-off Jan 2011 | 1575 46th Av | dry rot repair front of house. replace stucco in kind. see attached report #10647.Details
dry rot repair front of house. replace stucco in kind. see attached report #10647. | $2,000 |
| Jun 11, 2010 | Completed final sign-off Jan 2011 | 1575 46th Av | bathroom remodel/kitchen remodel. replace windows/skylights. update plmg and electrical.150 sq ft kitchen, 40 sq ft bath upper, lower bath 40 sq ft. install flash water heater. refinish hardwood floors.Details
bathroom remodel/kitchen remodel. replace windows/skylights. update plmg and electrical.150 sq ft kitchen, 40 sq ft bath upper, lower bath 40 sq ft. install flash water heater. refinish hardwood floors. | $40,000 |
| Feb 1, 2010 | Completed final sign-off Apr 2010 | 1584 48th Av | unit a: bathroom renovation - relocation of fixtures, replace water heater with tankless water heater. install washer/dryer hook-ups for stackable washer/dryer. move waste lines and electrical fixtures. no structural changes. high efficacy lighting or occupancy sensor. w.h. located outdoor.Details
unit a: bathroom renovation - relocation of fixtures, replace water heater with tankless water heater. install washer/dryer hook-ups for stackable washer/dryer. move waste lines and electrical fixtures. no structural changes. high efficacy lighting or occupancy sensor. w.h. located outdoor. | $3,500 |
| May 21, 2009 | Completed final sign-off Apr 2010 | 1584 48th Av | kitchen renovation - replace kitchen cabinet, relocate stove gas line & add additional line for water heater.Details
kitchen renovation - replace kitchen cabinet, relocate stove gas line & add additional line for water heater. | $8,500 |