Back to bathroom remodel contractors
Deasy Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2011 to Dec 2023
- Last 24 months
- 0 permits filed
15 permits since 2000: 11 completed, 4 never finaled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 4 completed, 2 never finaled. Typically 10 days from filing to permit and 370 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 5, 2023 | Completed final sign-off Sep 2024 | 453 Colon Av | interior remodel on 2nd fl. remodel (e) kitchen and bathroom. add new master bathroom. add new skylight. close (e) windows and add a new kitchen window at side (north) elevation. remove load bearing wall in the kitchen.Details
interior remodel on 2nd fl. remodel (e) kitchen and bathroom. add new master bathroom. add new skylight. close (e) windows and add a new kitchen window at side (north) elevation. remove load bearing wall in the kitchen. | $150,000 |
| Feb 23, 2021 | Never finaled issued Sep 2021, no final | 735 Victoria St | 1st fl renovate unconditioned space into wine storage, laundry, 3 bedrooms, 2 bathrooms & storage/utility. 2nd fl relocate stair, renovate 3 bedrooms, kitchen into master suite, bedroom & bath. new kitchen layout. new office/nursey. rear yard new pergola. new eleectrical/plumbing as required.Details
1st fl renovate unconditioned space into wine storage, laundry, 3 bedrooms, 2 bathrooms & storage/utility. 2nd fl relocate stair, renovate 3 bedrooms, kitchen into master suite, bedroom & bath. new kitchen layout. new office/nursey. rear yard new pergola. new eleectrical/plumbing as required. | $344,000 |
| Feb 8, 2019 | Completed final sign-off Jan 2020 | 735 Victoria St | bathroom remodel, new fixtures and fittingsDetails
bathroom remodel, new fixtures and fittings | $20,000 |
| Oct 28, 2015 | Completed final sign-off Apr 2016 | 2322 21st Av | interior remodel - remove light well and stairs within lightwell. build new interior stairs, connecting 1st & 2nd floors. new beam in garage - remove post beam. move partition walls on 1ft floor and add new bathroom.Details
interior remodel - remove light well and stairs within lightwell. build new interior stairs, connecting 1st & 2nd floors. new beam in garage - remove post beam. move partition walls on 1ft floor and add new bathroom. | $90,000 |
| Feb 12, 2013 | Completed final sign-off Mar 2014 | 3655 Lawton St | relocation of water, floor drains, electrical outlets. upgrading interior cabinetry enlarge (e) ada bathroom. installing equipment-soda & beer taps, 3 compartment sinks, elevated platform. replace exterior bi-fold doorDetails
relocation of water, floor drains, electrical outlets. upgrading interior cabinetry enlarge (e) ada bathroom. installing equipment-soda & beer taps, 3 compartment sinks, elevated platform. replace exterior bi-fold door | $12,000 |
| Feb 8, 2012 | Never finaled issued Feb 2012, no final | 3467 19th St | remodel to two bathrooms on residential only.Details
remodel to two bathrooms on residential only. | $12,000 |