Back to bathroom remodel contractors
Dean Alac
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Aug 2007
- Last 24 months
- 0 permits filed
107 permits since 2000: 62 completed, 8 never finaled, 37 expired or cancelled.
Of the 8 never-finaled permits, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
23 bathroom remodel permits: 12 completed, 2 never finaled, 9 expired or cancelled. Typically 0 days from filing to permit and 159 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 15, 2007 | Expired or cancelled cancelled Mar 2018 | 1050 Baker St | correct nov#200712730,remove illegal kitchen and legalize bathroom @ 1 st floor.Details
correct nov#200712730,remove illegal kitchen and legalize bathroom @ 1 st floor. | $10,000 |
| Jul 16, 2007 | Never finaled issued Jul 2007, no final | 1592 Golden Gate Av | 2nd floor - correct nov 200797936 for kitchen and bathroom remodel without a permit.Details
2nd floor - correct nov 200797936 for kitchen and bathroom remodel without a permit. | $25,500 |
| Jul 16, 2007 | Expired or cancelled cancelled Mar 2018 | 1050 Baker St | kitchen & bathroom remodel in unit# 1. new kitchen sink & dishwasher. new shower valve & sink in bathroom. change light fixtures through out. repair of 6 decks. no more than 50%. repair in kind. to comply with his nov# 200700941 dated 04/27/2007.Details
kitchen & bathroom remodel in unit# 1. new kitchen sink & dishwasher. new shower valve & sink in bathroom. change light fixtures through out. repair of 6 decks. no more than 50%. repair in kind. to comply with his nov# 200700941 dated 04/27/2007. | $15,000 |
| Jul 16, 2007 | Never finaled issued Jul 2007, no final | 1594 Golden Gate Av | 1st floor - correct nov 200797255 for kitchen & bathroom remodel without a permit.Details
1st floor - correct nov 200797255 for kitchen & bathroom remodel without a permit. | $25,000 |
| Jul 10, 2007 | Completed final sign-off Aug 2007 | 303 Webster St | kitchen and bath remodel: replace cabinets, appliances in kind. to address nov# 200709691Details
kitchen and bath remodel: replace cabinets, appliances in kind. to address nov# 200709691 | $15,000 |
| Mar 23, 2007 | Completed final sign-off Jun 2007 | 647 Grand View Av | unit 2 - add new bathroom and laundry to exist storage space. replace exist windows with new double pane, remodel kitchen and 2 baths.all work in unit 2. sprinkler under seperate permit. nov 200344088.Details
unit 2 - add new bathroom and laundry to exist storage space. replace exist windows with new double pane, remodel kitchen and 2 baths.all work in unit 2. sprinkler under seperate permit. nov 200344088. | $35,000 |
| Mar 9, 2007 | Completed final sign-off Oct 2007 | 647 Grand View Av | remodel existing kitchen & 2 bathrooms, same location, new cabinets, fixtures , appliances, flooring and painting throughout unit.Details
remodel existing kitchen & 2 bathrooms, same location, new cabinets, fixtures , appliances, flooring and painting throughout unit. | $3,500 |
| Jan 29, 2007 | Expired or cancelled expired May 2010 | 924 Grove St | light demo throughout and remodal of kitchen & bathroom tixtures per building insp kevin mckews request. sesmic upgrade & additional plans may be required if pa#200603307854 is not approved & final inspected.Details
light demo throughout and remodal of kitchen & bathroom tixtures per building insp kevin mckews request. sesmic upgrade & additional plans may be required if pa#200603307854 is not approved & final inspected. | $20,000 |
| Oct 18, 2006 | Expired or cancelled expired Jun 2008 | 888 North Point St | no structural changes-2 kitchen & 2 bathroom remodel. replace cabinets in kind & window. replace bathroom fixtures in kind. 50% of kitchen lighting to be flourscent.Details
no structural changes-2 kitchen & 2 bathroom remodel. replace cabinets in kind & window. replace bathroom fixtures in kind. 50% of kitchen lighting to be flourscent. | $45,000 |
| Oct 18, 2006 | Expired or cancelled expired May 2010 | 924 Grove St | kitchen & bathroom remodel-replace kitchen cabinets & appliances, replace bathroom fixtures, minor dry rot repair & lath/plaster repair. no structural changes-50% of lighting to be flourescent.Details
kitchen & bathroom remodel-replace kitchen cabinets & appliances, replace bathroom fixtures, minor dry rot repair & lath/plaster repair. no structural changes-50% of lighting to be flourescent. | $32,000 |
| May 26, 2006 | Completed final sign-off Jun 2007 | 3443 Clay St | soft demo. removal of kitchen cabinets & appliance. bathroom fixtures. trim lath & plaster. repair & replace with new. non structrual.Details
soft demo. removal of kitchen cabinets & appliance. bathroom fixtures. trim lath & plaster. repair & replace with new. non structrual. | $10,000 |
| Feb 6, 2006 | Completed final sign-off Apr 2006 | 101 Bradford St | kitchen and bath remodel new door onto extg deckDetails
kitchen and bath remodel new door onto extg deck | $24,000 |
| Dec 29, 2005 | Completed final sign-off Jul 2006 | 1805 Page St | 3 kitchens, 6 bathroom remodel no new lightingDetails
3 kitchens, 6 bathroom remodel no new lighting | $65,000 |
| Aug 26, 2005 | Completed final sign-off Oct 2005 | 196 16th Av | rev to pa# 2005/05/06/1809. to add 3 bathroom, office & bedroom to (e) 1st floor, frame new wall atDetails
rev to pa# 2005/05/06/1809. to add 3 bathroom, office & bedroom to (e) 1st floor, frame new wall at | $50,000 |
| Nov 5, 2004 | Completed final sign-off Oct 2005 | 196 16th Av | kitchen and bath remodel. replace kitchen cabinets, appliances. replace bathroom fixtures. no strucDetails
kitchen and bath remodel. replace kitchen cabinets, appliances. replace bathroom fixtures. no struc | $11,500 |
| Apr 4, 2001 | Expired or cancelled expired Jan 2003 | 267 14th Av | kitchen 3 bath rmdl plumb elec sep drywl repair as needed demo garg dry rot sun rm cabnts fixturesDetails
kitchen 3 bath rmdl plumb elec sep drywl repair as needed demo garg dry rot sun rm cabnts fixtures | $80,000 |
| Mar 6, 2001 | Expired or cancelled expired Mar 2002 | 2621 Divisadero St | kitchen and 2 bath remodel removal of sht rock for plumb/elec, replace cabinets,fixtures,tileDetails
kitchen and 2 bath remodel removal of sht rock for plumb/elec, replace cabinets,fixtures,tile | $60,000 |
| Aug 11, 2000 | Expired or cancelled expired Apr 2002 | 3621 Divisadero St | extend home to the rear, add two bedrms & one bath on street level, remodel kitchen-close-in 2 lightDetails
extend home to the rear, add two bedrms & one bath on street level, remodel kitchen-close-in 2 light | $300,000 |
| Jul 27, 2000 | Completed final sign-off Mar 2001 | 260 32nd Av | kitchen * 3 bathroom remodel, new tile, etcDetails
kitchen * 3 bathroom remodel, new tile, etc | $80,000 |
| Jul 13, 2000 | Completed final sign-off Jun 2001 | 206 Anza St | new fixtures, tile plumbing, cabinets, elect , kitchen & bathroom remodelDetails
new fixtures, tile plumbing, cabinets, elect , kitchen & bathroom remodel | $65,000 |
| May 4, 2000 | Expired or cancelled expired Nov 2000 | 628 Lake St | bathroom remodeling, fixtures replacement in master bathroomDetails
bathroom remodeling, fixtures replacement in master bathroom | $10,000 |
| Apr 3, 2000 | Completed final sign-off May 2000 | 3425 16th St | kitchen/bath remodel,plumb/elect upgrd,drywall as neededDetails
kitchen/bath remodel,plumb/elect upgrd,drywall as needed | |
| Mar 10, 2000 | Completed final sign-off Jun 2000 | 2525 Steiner St | upgrade framing at bathroom walls, upgrade framing at partial ceiling rafters, add header over windoDetails
upgrade framing at bathroom walls, upgrade framing at partial ceiling rafters, add header over windo | $5,000 |