Back to bathroom remodel contractors
De Build Group Inc
- Based in
- Oakland
- On San Francisco permits
- Nov 2019 to Jul 2021
- Last 24 months
- 0 permits filed
3 permits since 2000: 1 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 294 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 30, 2019 | Completed final sign-off Oct 2020 | 2495 20th Av | minor electrical & plumbing. replace old vanity, install washer & dryer area. replace old fan in bathroom. update pipes on toiletDetails
minor electrical & plumbing. replace old vanity, install washer & dryer area. replace old fan in bathroom. update pipes on toilet | $2,000 |