Dba Golden Gate Termite, Diodati Inc
- Based in
- Burlingame
- On San Francisco permits
- Jan 2000 to Apr 2026
- Last 24 months
- 3 permits filed
179 permits since 2000: 143 completed, 20 never finaled, 16 expired or cancelled.
Of the 20 never-finaled permits, 3 are 3 to 5 years old, 8 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
22 deck permits: 17 completed, 3 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 77 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 1, 2021 | Expired or cancelled cancelled Jan 2026 | 554 Mangels Av | install retainning wall and replace (e) wood deck at rear w/ similar design and mertial as outlined in plans by engineer peter nissen. like for like.Details
install retainning wall and replace (e) wood deck at rear w/ similar design and mertial as outlined in plans by engineer peter nissen. like for like. | $90,000 |
| Feb 19, 2020 | Completed final sign-off Sep 2020 | 445 Diamond St | repair of (e) decks, see plans by peter nissen engineer like for likeDetails
repair of (e) decks, see plans by peter nissen engineer like for like | $45,000 |
| May 23, 2018 | Completed final sign-off Jun 2018 | 2700 15th Av | repair dryrot and termite damage as outlined in golden gate termite report 201919 dated 5/8/18, like for like less than 50%. stairs/decks memer replace in-kind less than 50%Details
repair dryrot and termite damage as outlined in golden gate termite report 201919 dated 5/8/18, like for like less than 50%. stairs/decks memer replace in-kind less than 50% | $28,000 |
| Dec 5, 2016 | Never finaled issued Dec 2016, no final | 519 Birch St | pre-construction meeting is requared with city inspetor. repair fungus damaged lower and upper left deck and upper right deck. no structural repairs, less than 50% in rear. no structural changes replacement of fungus damaged members only. refer to golden gate termite report #20836Details
pre-construction meeting is requared with city inspetor. repair fungus damaged lower and upper left deck and upper right deck. no structural repairs, less than 50% in rear. no structural changes replacement of fungus damaged members only. refer to golden gate termite report #20836 | $4,500 |
| Nov 24, 2014 | Never finaled issued Nov 2014, no final | 2243 29th Av | performed the repairs as outlined in the termite reports #20693 item #6 and #20695 item #1. all repair in kind. repair dryrot front stucco like for like. repair dryrot in rear deck less than 50%. update railing to 4" o.c.Details
performed the repairs as outlined in the termite reports #20693 item #6 and #20695 item #1. all repair in kind. repair dryrot front stucco like for like. repair dryrot in rear deck less than 50%. update railing to 4" o.c. | $9,850 |
| Jul 25, 2014 | Completed final sign-off Jul 2014 | 1162 Dolores St | repairs to rear porch and deck joists. see report #20672 dated 5/12/14. like for like. less than 50%Details
repairs to rear porch and deck joists. see report #20672 dated 5/12/14. like for like. less than 50% | $4,500 |
| Nov 21, 2013 | Completed final sign-off Jan 2014 | 436 Oak St | repair the dryrot on the rear deck and stairs. like for like. less than 50%.Details
repair the dryrot on the rear deck and stairs. like for like. less than 50%. | $14,500 |
| Sep 26, 2013 | Completed final sign-off Oct 2013 | 4425 18th St | revision to app#201308214921. repair deck at rear yard.Details
revision to app#201308214921. repair deck at rear yard. | |
| Sep 24, 2013 | Completed final sign-off Oct 2013 | 1454 Jefferson St | replace the tiles on the center deck like per likeDetails
replace the tiles on the center deck like per like | $9,800 |
| Aug 21, 2013 | Never finaled issued Aug 2013, no final | 4425 18th St | repair rear deck as per termite report #20631; like for like not more than 50%; the work will consist of installing new posts and piers; repairing framing and decking and installation of 2 x 2 picket hand railing at 4" on centres to meet code.Details
repair rear deck as per termite report #20631; like for like not more than 50%; the work will consist of installing new posts and piers; repairing framing and decking and installation of 2 x 2 picket hand railing at 4" on centres to meet code. | $8,700 |
| May 28, 2013 | Completed final sign-off Aug 2013 | 736 Judah St | repair handrail on rear deck less than 50%. repair dryrot and stucco banister. no structural repairs. repair dryrot in center corner like for likeDetails
repair handrail on rear deck less than 50%. repair dryrot and stucco banister. no structural repairs. repair dryrot in center corner like for like | |
| Oct 24, 2012 | Expired or cancelled expired Apr 2023 | 7 Hill Point Av | installation of rear yard deck and retaining walls.Details
installation of rear yard deck and retaining walls. | $40,000 |
| Oct 18, 2010 | Completed final sign-off Nov 2010 | 24 Ford St | revision to permit application no. 201009100671: replace rear deck to address complaint no. 201052038.Details
revision to permit application no. 201009100671: replace rear deck to address complaint no. 201052038. | $2,000 |
| Sep 10, 2010 | Completed final sign-off Nov 2010 | 24 Ford St | rear deck - repair dry rot to framing and a portion of decking. no structural changes, like for like, les than 50%, replace damaged framing, decking, nailing.Details
rear deck - repair dry rot to framing and a portion of decking. no structural changes, like for like, les than 50%, replace damaged framing, decking, nailing. | $9,500 |
| Jun 25, 2010 | Completed final sign-off Sep 2010 | 189 Galewood Cr | repair dryrot at rear deck. no structural. less than 50% repair in-kind. replace stucco where damaged at deck. not visible from street.Details
repair dryrot at rear deck. no structural. less than 50% repair in-kind. replace stucco where damaged at deck. not visible from street. | $6,500 |
| May 28, 2010 | Completed final sign-off Sep 2010 | 187 Galewood Cr | repair rear deck. no structural and less than 50%. repair in-kind.Details
repair rear deck. no structural and less than 50%. repair in-kind. | $14,000 |
| May 4, 2010 | Completed final sign-off Aug 2010 | 1983 San Jose Av | dry rot repair. repair parappet wall at roof, both sides. no structural repair. stucco repair. deck repair less then 50%. repair in kind.Details
dry rot repair. repair parappet wall at roof, both sides. no structural repair. stucco repair. deck repair less then 50%. repair in kind. | $6,500 |
| Nov 16, 2009 | Completed final sign-off Feb 2010 | 63 Ford St | revision to pa# 2009.05.21.8937. extend office room 3' x 3' on 1st fl above garage. replace ceiling beam. replace (e) windows (3). repair deck and stairs at rear of building. bring railing to code.Details
revision to pa# 2009.05.21.8937. extend office room 3' x 3' on 1st fl above garage. replace ceiling beam. replace (e) windows (3). repair deck and stairs at rear of building. bring railing to code. | $3,000 |
| May 21, 2009 | Completed final sign-off Feb 2010 | 63 Ford St | fungus damage repairs, bring railing to code, replace two doors and sashes as required. no structural repairs, like for like see termite report #20197. all proposed work is at the rear of the bldg. & not visible from the public way. total repair of rear deck & stairs no to exceed 50% total.Details
fungus damage repairs, bring railing to code, replace two doors and sashes as required. no structural repairs, like for like see termite report #20197. all proposed work is at the rear of the bldg. & not visible from the public way. total repair of rear deck & stairs no to exceed 50% total. | $9,500 |
| Jul 9, 2008 | Completed final sign-off Jul 2008 | 1471 15th St | dry rot repair as noted on report# 20156 for steps rear & side. bracing for decks. less than 50%. perform items 1-6. no structural repairs.Details
dry rot repair as noted on report# 20156 for steps rear & side. bracing for decks. less than 50%. perform items 1-6. no structural repairs. | $4,500 |
| Jul 11, 2001 | Completed final sign-off Mar 2002 | 1263 12th Av | replace existing deck as per plans, same sizeDetails
replace existing deck as per plans, same size | $17,000 |
| Dec 13, 2000 | Completed final sign-off Apr 2001 | 707 Moultrie St | build firewall/repair/replace portion of extg decksDetails
build firewall/repair/replace portion of extg decks | $5,000 |