Back to bathroom remodel contractors
Davies Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Dec 2009
- Last 24 months
- 0 permits filed
31 permits since 2000: 22 completed, 1 never finaled, 8 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 166 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 9, 2008 | Completed final sign-off Feb 2009 | 345 Upper Tr | existing laundryroom change to new bedroom. add window at east facade, remove wall to open & remodel bathroom,Details
existing laundryroom change to new bedroom. add window at east facade, remove wall to open & remodel bathroom, | $40,500 |
| May 13, 2008 | Completed final sign-off Jan 2009 | 219 Brannan St | remove carpet flooring.replace with hardwood.remove existing bathroom tile and replace with marble.remove existing interior window coverings and install new window coverings throughout. install 18" x 16" steel (light weight) framed soffit in living room and master bedroom. no change in wall locationDetails
remove carpet flooring.replace with hardwood.remove existing bathroom tile and replace with marble.remove existing interior window coverings and install new window coverings throughout. install 18" x 16" steel (light weight) framed soffit in living room and master bedroom. no change in wall location | $85,000 |
| Feb 23, 2007 | Completed final sign-off Aug 2007 | 1924 Washington St | new bathroom in storage room at garage level.Details
new bathroom in storage room at garage level. | $10,000 |
| Dec 9, 2005 | Completed final sign-off Feb 2007 | 1 Villa Tr | replacement & extension of exterior decks, replacement of windows & siding on east bldg face, addition of window on property line & at courtyard. conversion of a lightwell to a courtyard,renovation of office suite, bedroom, laundry area and 3 bathrooms.Details
replacement & extension of exterior decks, replacement of windows & siding on east bldg face, addition of window on property line & at courtyard. conversion of a lightwell to a courtyard,renovation of office suite, bedroom, laundry area and 3 bathrooms. | $280,000 |
| Jun 20, 2002 | Completed final sign-off Sep 2002 | 542 Noe St | bathroom remodel. replace bathtub,toilet,sink,&tile.no change in walls.Details
bathroom remodel. replace bathtub,toilet,sink,&tile.no change in walls. | $5,000 |