Back to bathroom remodel contractors
David Rodriguez Construction
- Based in
- Oakland
- On San Francisco permits
- Aug 2006 to Jun 2022
- Last 24 months
- 0 permits filed
8 permits since 2000: 8 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 430 days from filing to permit and 385 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 9, 2020 | Completed final sign-off Sep 2025 | 1363 35th Av | 2/f: remodel (e) kitchen & bathroom and add 1 bathroom & laundry; infill (e) lightwells (left and right); rebukld (e) interior stairs up to code from 2/f to ground; 2 new bedrooms, 2 bathrooms and media room on g/f.; replace (e) sheetrock with new 5/8in tyupe x, new electrical wiring & fixtures.Details
2/f: remodel (e) kitchen & bathroom and add 1 bathroom & laundry; infill (e) lightwells (left and right); rebukld (e) interior stairs up to code from 2/f to ground; 2 new bedrooms, 2 bathrooms and media room on g/f.; replace (e) sheetrock with new 5/8in tyupe x, new electrical wiring & fixtures. | $120,000 |
| Dec 16, 2019 | Completed final sign-off Jan 2022 | 150 Josiah Av | remove (e) powder room @ ground fl. install washer, dryer & sink @ ground fl. demo rear deck. remodel master bath. ref pa #201909262805 & #201909262808 are adu from single family dwelling to 3 units apartment.Details
remove (e) powder room @ ground fl. install washer, dryer & sink @ ground fl. demo rear deck. remodel master bath. ref pa #201909262805 & #201909262808 are adu from single family dwelling to 3 units apartment. | $125,000 |
| Sep 26, 2019 | Completed final sign-off Jan 2022 | 150 Josiah Av | 1 adu (unit #1) per ord. 162-17. (n) egress corridor per eg-05. (n) eero for bedroom. (n) kitchen to replace existing. (n) bathroom to replace (e). (n) furnace, flash water heater, washer & dryer. (n) doors to garden. ref# 201909262805 & 201912169631.Details
1 adu (unit #1) per ord. 162-17. (n) egress corridor per eg-05. (n) eero for bedroom. (n) kitchen to replace existing. (n) bathroom to replace (e). (n) furnace, flash water heater, washer & dryer. (n) doors to garden. ref# 201909262805 & 201912169631. | $40,000 |
| Sep 26, 2019 | Completed final sign-off Jan 2022 | 150 Josiah Av | dwelling unit legalization (unit #1) per ord. 43-14. adu of unit #2 ref 201909262808 & 201912169631. common egress corridor per eg-05 for both units & (e) unit #3. update kitchen & bath. (n) flooring and lighting. (n) furnace in garage.Details
dwelling unit legalization (unit #1) per ord. 43-14. adu of unit #2 ref 201909262808 & 201912169631. common egress corridor per eg-05 for both units & (e) unit #3. update kitchen & bath. (n) flooring and lighting. (n) furnace in garage. | $30,000 |