Back to bathroom remodel contractors
David M Goray
- Based in
- Larkspur
- On San Francisco permits
- Feb 2012 to Sep 2026
- Last 24 months
- 4 permits filed
28 permits since 2000: 21 completed, 4 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 10 completed, 1 in progress. Typically 2 days from filing to permit and 134 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 21, 2025 | In progress issued Apr 2026 | 214 Bonview St | addition & renovation to main home w/ new bathroom and bedrooms added. renovation to apartment including partial renovation of kitchen & bathroom.Details
addition & renovation to main home w/ new bathroom and bedrooms added. renovation to apartment including partial renovation of kitchen & bathroom. | $487,945 |
| Oct 1, 2025 | Completed final sign-off Apr 2026 | 70 Bradford St | partial remodel to single family home to include kitchen and bathroomDetails
partial remodel to single family home to include kitchen and bathroom | $125,000 |
| Oct 6, 2023 | Completed final sign-off May 2024 | 80 San Andreas Wy | remodel one kitchen and two bathrooms in-kind. update with new cabinets + fixtures. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0 (k)3 and (k)5.Details
remodel one kitchen and two bathrooms in-kind. update with new cabinets + fixtures. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0 (k)3 and (k)5. | $15,000 |
| Oct 1, 2021 | Completed final sign-off Jun 2022 | 266 Amber Dr | infill of an existing lightwell, not visible from other properties up to first story roof line. interior remodeling to include addition of a new home gym within lighwell at first fl and creation of a new wall through closet, and remodeling (e) bathroom at lower fl.Details
infill of an existing lightwell, not visible from other properties up to first story roof line. interior remodeling to include addition of a new home gym within lighwell at first fl and creation of a new wall through closet, and remodeling (e) bathroom at lower fl. | $45,000 |
| Jul 31, 2020 | Completed final sign-off Dec 2020 | 405 Broderick St | kitchen (10.5x12.5) and bathroom (10.5x5.5) remodel, in-kind.Details
kitchen (10.5x12.5) and bathroom (10.5x5.5) remodel, in-kind. | $30,000 |
| Nov 18, 2019 | Completed final sign-off Mar 2020 | 2400 Webster St | unit #2 - bathroom remodel in-kindDetails
unit #2 - bathroom remodel in-kind | $10,000 |
| Sep 23, 2019 | Completed final sign-off Dec 2019 | 875 La Playa | replace toilet and sink, new vanity, new tile floor. bathroom remodel in kind.Details
replace toilet and sink, new vanity, new tile floor. bathroom remodel in kind. | $3,000 |
| May 24, 2019 | Completed final sign-off Feb 2020 | 882 48th Av | update bathroom - new shower, tile & floor. new led lights gfi. 40 sq ft. new plumbing fixturesDetails
update bathroom - new shower, tile & floor. new led lights gfi. 40 sq ft. new plumbing fixtures | $10,000 |
| Mar 4, 2019 | Completed final sign-off Jul 2019 | 235 Waller St | refresh bathroom - new tile and plumbing fixtures make sure all codes are enforced. change tub to shower. 30 sq ftDetails
refresh bathroom - new tile and plumbing fixtures make sure all codes are enforced. change tub to shower. 30 sq ft | $8,000 |
| Nov 19, 2018 | Completed final sign-off Feb 2019 | 2945 Pacific Av | unit 1. bathroom remodel w/ addition of new shower.Details
unit 1. bathroom remodel w/ addition of new shower. | $30,000 |
| Mar 7, 2018 | Completed final sign-off Jun 2018 | 342 Granada Av | bathroom remodel - replace shower pan, repair dryrot, new plumbing fixtures, new led lighting.Details
bathroom remodel - replace shower pan, repair dryrot, new plumbing fixtures, new led lighting. | $8,000 |