Back to bathroom remodel contractors
David Edward Conroy
- Based in
- Daly City
- On San Francisco permits
- Aug 2004 to Aug 2026
- Last 24 months
- 13 permits filed
66 permits since 2000: 57 completed, 5 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
23 bathroom remodel permits: 20 completed, 2 in progress, 1 never finaled. Typically 0 days from filing to permit and 125 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 8, 2026 | In progress issued Jul 2026 | 228 Connecticut St | remodel two bathrooms at rear of home. in one bathroom that has a tub and a shower, remove the tub and keep shower.Details
remodel two bathrooms at rear of home. in one bathroom that has a tub and a shower, remove the tub and keep shower. | $55,000 |
| Jan 24, 2025 | Completed final sign-off May 2025 | 50 San Buenaventura Wy | remodel 1 bath. no change to layout. no walls to be removed.Details
remodel 1 bath. no change to layout. no walls to be removed. | $28,000 |
| Jan 9, 2025 | Completed final sign-off Feb 2025 | 69 San Jacinto Wy | 1 bathroom remodel. same layout as before, no wall demolition or construction, no change in plumbing fixture count.Details
1 bathroom remodel. same layout as before, no wall demolition or construction, no change in plumbing fixture count. | $18,000 |
| Nov 20, 2024 | In progress issued Nov 2024 | 1875 Greenwich St | remodel kitchen and bathroom in kindDetails
remodel kitchen and bathroom in kind | $5,000 |
| Jul 14, 2023 | Completed final sign-off May 2024 | 276 28th St | interior remodel. new primary bathroom. relocate (e) closet. relocate washer/dryer into new laundry closet.Details
interior remodel. new primary bathroom. relocate (e) closet. relocate washer/dryer into new laundry closet. | $25,000 |
| Aug 5, 2022 | Completed final sign-off Nov 2022 | 550 Davis St | remodel 1 bathroom (unit #27) no structural workDetails
remodel 1 bathroom (unit #27) no structural work | $22,000 |
| Jul 26, 2022 | Completed final sign-off Jan 2023 | 626 Castro St | remodel two bathrooms.Details
remodel two bathrooms. | $30,000 |
| Jan 27, 2022 | Completed final sign-off May 2022 | 1973 17th Av | remodel to (e) bathroom within footprint for new layout & curbless shower. conversion of (e) hall toilet room into (n) laundry room with side-by-side washer & dryer. conversion of (e) laundry room into a bathroom. replacement of 3 windows added in the (e) bathroom.Details
remodel to (e) bathroom within footprint for new layout & curbless shower. conversion of (e) hall toilet room into (n) laundry room with side-by-side washer & dryer. conversion of (e) laundry room into a bathroom. replacement of 3 windows added in the (e) bathroom. | $20,000 |
| Aug 9, 2021 | Completed final sign-off Apr 2022 | 41 Dellbrook Av | new bath and family room at gr fl. 562 sf remodeled.Details
new bath and family room at gr fl. 562 sf remodeled. | $75,000 |
| Apr 15, 2021 | Completed final sign-off Aug 2021 | 624 Castro St | remodel one bathroom & one powder room. replace two windows in bthrom & powder room. not visible frm street in existing opening. no structural alterations.Details
remodel one bathroom & one powder room. replace two windows in bthrom & powder room. not visible frm street in existing opening. no structural alterations. | $22,000 |
| Feb 14, 2020 | Completed final sign-off Nov 2020 | 771 Dolores St | kitchen remodel cabinets, elec, plumbing. bath remodel, fixtures, elec, plumbingDetails
kitchen remodel cabinets, elec, plumbing. bath remodel, fixtures, elec, plumbing | $49,000 |
| Jun 27, 2019 | Completed final sign-off Sep 2020 | 2088 Bush St | rev to pa# 201811075330; (n) bedroom & bath at rear of ground level, no changes no work at top level or at exterior stairs/deckDetails
rev to pa# 201811075330; (n) bedroom & bath at rear of ground level, no changes no work at top level or at exterior stairs/deck | $25,000 |
| Mar 29, 2019 | Completed final sign-off Aug 2019 | 50 San Buenaventura Wy | bath remodel, no layout changes. dryrot repair & partial replacement of wood framing w/ conc wall at basement wall.Details
bath remodel, no layout changes. dryrot repair & partial replacement of wood framing w/ conc wall at basement wall. | $25,000 |
| Nov 7, 2018 | Completed final sign-off Sep 2020 | 2088 Bush St | remodel (e) kitchen & (e) bath @ ground level; relocate rear egress door; repair & replace dryrot @ rear deck/existing stairsDetails
remodel (e) kitchen & (e) bath @ ground level; relocate rear egress door; repair & replace dryrot @ rear deck/existing stairs | $45,000 |
| May 25, 2017 | Never finaled issued May 2017, no final | 1186 Dolores St | remodel 1 full bathroom, remodel powder room add new fan and replace toilet, sink to remain. install six windows not visible from street. all remodel in-kind, no walls to be altered.Details
remodel 1 full bathroom, remodel powder room add new fan and replace toilet, sink to remain. install six windows not visible from street. all remodel in-kind, no walls to be altered. | $22,000 |
| Feb 11, 2016 | Completed final sign-off Oct 2020 | 1125 Hayes St | 1)nw stairs at grnd level, remove e interior stair. 2) nw door & wall opening at grnd level bathroom. 3)nw door & partition wall at mechanical room. 4) relocate elec. panel. 5)adding grnd level counter. 6)nw dr at 3rd flr bath closet,nw opening,w/d elec./mech/plmgDetails
1)nw stairs at grnd level, remove e interior stair. 2) nw door & wall opening at grnd level bathroom. 3)nw door & partition wall at mechanical room. 4) relocate elec. panel. 5)adding grnd level counter. 6)nw dr at 3rd flr bath closet,nw opening,w/d elec./mech/plmg | $32,000 |
| Aug 19, 2014 | Completed final sign-off Dec 2014 | 2227 39th Av | remodel bathroom same as original. no electrical workDetails
remodel bathroom same as original. no electrical work | $12,000 |
| May 24, 2013 | Completed final sign-off Sep 2013 | 1824 Beach St | remodel kitchen, add outlets, cabinets, appliances. new bathroom. replace new windows. remodel bathroom. fixtures, tiles, plumbingDetails
remodel kitchen, add outlets, cabinets, appliances. new bathroom. replace new windows. remodel bathroom. fixtures, tiles, plumbing | $90,000 |
| Aug 1, 2012 | Completed final sign-off Sep 2012 | 51 Molimo Dr | remodel one bathroom. replace one skylight in kind. replace two windows in kind-2 front & 1 side w/ vinyl or similar in kind. wood/paintable fiberglass casement windows.Details
remodel one bathroom. replace one skylight in kind. replace two windows in kind-2 front & 1 side w/ vinyl or similar in kind. wood/paintable fiberglass casement windows. | $21,137 |
| Nov 1, 2006 | Completed final sign-off Jun 2007 | 207 Ripley St | remodel (2) bathroom, (1) kitchen, 1 wetbar. install (15) windows (replace with similar wood).Details
remodel (2) bathroom, (1) kitchen, 1 wetbar. install (15) windows (replace with similar wood). | $74,300 |
| Aug 21, 2006 | Completed final sign-off Apr 2007 | 873 South Van Ness Av | remodel 1 kitchen and 1 bathroom. replace two skylights. in kind. all work with in unit3tic building both owners agree to work 873 south van ness.Details
remodel 1 kitchen and 1 bathroom. replace two skylights. in kind. all work with in unit3tic building both owners agree to work 873 south van ness. | $42,500 |
| Nov 19, 2004 | Completed final sign-off Oct 2005 | 223 Sanchez St | remodel 2 baths, 1 kitchen on bottom floor, 1st flr, remodel bath and kitchen on 2nd floor. complyDetails
remodel 2 baths, 1 kitchen on bottom floor, 1st flr, remodel bath and kitchen on 2nd floor. comply | $60,000 |
| Aug 12, 2004 | Completed final sign-off Aug 2005 | 690 03rd Av | replace 23 windows in kind,size for size,same location,remodel 2 kitchen,2 bath,replace siding @reaDetails
replace 23 windows in kind,size for size,same location,remodel 2 kitchen,2 bath,replace siding @rea | $74,500 |