Dave Mason Building
- Based in
- San Rafael
- On San Francisco permits
- Feb 2006 to Feb 2026
- Last 24 months
- 5 permits filed
60 permits since 2000: 49 completed, 5 never finaled, 6 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
24 bathroom remodel permits: 19 completed, 3 never finaled, 2 expired or cancelled. Typically 4 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 6, 2026 | Completed final sign-off Jul 2026 | 159 Stillings Av | remodel 1 kitchen and 1 bath. replace interior stairs.Details
remodel 1 kitchen and 1 bath. replace interior stairs. | $65,000 |
| Jan 10, 2025 | Completed final sign-off Oct 2025 | 163 Carl St | revision 202404250718- increasing scope to include basement work. remodel (e) bathroom and laundry room to include replacing fixtures and finishes located at basementDetails
revision 202404250718- increasing scope to include basement work. remodel (e) bathroom and laundry room to include replacing fixtures and finishes located at basement | $35,000 |
| Apr 25, 2024 | Completed final sign-off Oct 2025 | 163 Carl St | remodel kitchen on 1st floor, add powder room on 1st floor, remodel master bathroom and closet, replace (1) exterior door and (2) windows in the same opening located at the rear of propertyDetails
remodel kitchen on 1st floor, add powder room on 1st floor, remodel master bathroom and closet, replace (1) exterior door and (2) windows in the same opening located at the rear of property | $115,000 |
| Dec 20, 2022 | Never finaled issued Dec 2022, no final | 2740 Buchanan St | (2) bathrooms: replace fixtures and tile, in kind. non structural remodelsDetails
(2) bathrooms: replace fixtures and tile, in kind. non structural remodels | $30,000 |
| Dec 20, 2022 | Completed final sign-off Feb 2024 | 2742 Buchanan St | (1) bathroom remodel: replace fixtures and tile in kind. non structuralDetails
(1) bathroom remodel: replace fixtures and tile in kind. non structural | $20,000 |
| Apr 27, 2021 | Completed final sign-off Mar 2023 | 2928 Washington St | remodel kitchen & 2 bathrooms. add 5 property line windows, fire rated. replace 2 existing windows in existing opening. no work on front facade.Details
remodel kitchen & 2 bathrooms. add 5 property line windows, fire rated. replace 2 existing windows in existing opening. no work on front facade. | $120,000 |
| Jun 13, 2019 | Completed final sign-off Dec 2020 | 3016 Washington St | revision to app#201901170619. ground floor:adjust location of moment frame. remove furnace for 3016. install new furnace/adjust furnace locations for both 3016-3018 furnaces. st floor: enlarge main bath. remove extg window & install nw windows. add closet for bedroom into extg living room & space.Details
revision to app#201901170619. ground floor:adjust location of moment frame. remove furnace for 3016. install new furnace/adjust furnace locations for both 3016-3018 furnaces. st floor: enlarge main bath. remove extg window & install nw windows. add closet for bedroom into extg living room & space. | $4,200 |
| Jan 17, 2019 | Completed final sign-off Dec 2020 | 3018 Washington St | interior modification to g/f garage & 1/f unit 3018 washington. garage parking will be enlarged into extg storage to provide 2 tandem parking spaces. the e kitchen & dining will be demolished & new open kitchen. dining & sitting area will b const. e bathroom is demolish 2 n bathrooms are constructedDetails
interior modification to g/f garage & 1/f unit 3018 washington. garage parking will be enlarged into extg storage to provide 2 tandem parking spaces. the e kitchen & dining will be demolished & new open kitchen. dining & sitting area will b const. e bathroom is demolish 2 n bathrooms are constructed | $225,000 |
| Jan 30, 2018 | Completed final sign-off Jun 2018 | 2000 Baker St | conversion of e storage space to bedroom and bath, add 1 window on street sideDetails
conversion of e storage space to bedroom and bath, add 1 window on street side | $60,000 |
| Nov 27, 2017 | Completed final sign-off Apr 2018 | 2939 Pine St | front bldg - bathroom remodel, reconfigure (1) full bath into (2) full bathrooms with partition changeDetails
front bldg - bathroom remodel, reconfigure (1) full bath into (2) full bathrooms with partition change | $50,000 |
| Dec 14, 2016 | Completed final sign-off May 2018 | 866 Union St | demolish e bathroom, new bath in space. new sink added in e water closet spaceDetails
demolish e bathroom, new bath in space. new sink added in e water closet space | $23,500 |
| Dec 14, 2016 | Completed final sign-off Jun 2018 | 864 Union St | demolish e kitchen, kitchen storage/laundry and bath. new kitchen with laundry closet and dining area in e space. new bath in e space. add lavatory sink in e water closet spaceDetails
demolish e kitchen, kitchen storage/laundry and bath. new kitchen with laundry closet and dining area in e space. new bath in e space. add lavatory sink in e water closet space | $76,200 |
| Mar 28, 2016 | Completed final sign-off Apr 2016 | 49 Lloyd St | replace tile tube surround on 2 bathrooms w/ minor framing repair as req'd. framing to be repaired in kind. no walls moved, removed, added or infilled. all existing layouts to remain unchanged.Details
replace tile tube surround on 2 bathrooms w/ minor framing repair as req'd. framing to be repaired in kind. no walls moved, removed, added or infilled. all existing layouts to remain unchanged. | $12,000 |
| Aug 7, 2015 | Never finaled issued Jul 2016, no final | 4015 Folsom St | remodel to (e) 1/f unit of a 2 unit residence. all work within (e) bldg. footprint. (n) slab will be poured along with replacement of portion of (e) foundation walls. (e) kitchen & bathroom will be rebuilt. all (e) windows will be replaced. (n) electrical, lighting, plumbing & hvac work.Details
remodel to (e) 1/f unit of a 2 unit residence. all work within (e) bldg. footprint. (n) slab will be poured along with replacement of portion of (e) foundation walls. (e) kitchen & bathroom will be rebuilt. all (e) windows will be replaced. (n) electrical, lighting, plumbing & hvac work. | $40,000 |
| Jun 24, 2014 | Completed final sign-off Oct 2014 | 2725 Diamond St | 3/f - remodel existing bathroom per plan.Details
3/f - remodel existing bathroom per plan. | $25,000 |
| Jan 28, 2014 | Completed final sign-off Mar 2015 | 498 Capistrano Av | construct (n) 2-story addition. lower level will be a covered (new bath above) open air exit passage & garden area. upper level will have a (n) bathrm. 2 (e) windows will be removed & opening in filled. 3 (e) window will be replaced w/(n) windows. all of these are in the side & rear yards.Details
construct (n) 2-story addition. lower level will be a covered (new bath above) open air exit passage & garden area. upper level will have a (n) bathrm. 2 (e) windows will be removed & opening in filled. 3 (e) window will be replaced w/(n) windows. all of these are in the side & rear yards. | $61,200 |
| May 24, 2011 | Completed final sign-off Jul 2011 | 4273 22nd St | remodel bathroom in kind and replace sink, cabinet, toilete and shower. replace (e) light fixtures and switches. high efficacy lighting or occupancy sensor control.Details
remodel bathroom in kind and replace sink, cabinet, toilete and shower. replace (e) light fixtures and switches. high efficacy lighting or occupancy sensor control. | $7,500 |
| Nov 9, 2010 | Completed final sign-off Jan 2011 | 676 Alvarado St | replace guest bath fixtures, tub, vanity/sink & toilet in kind, re-tile flooring. 5'x7.5'Details
replace guest bath fixtures, tub, vanity/sink & toilet in kind, re-tile flooring. 5'x7.5' | $7,500 |
| Sep 30, 2010 | Completed final sign-off Nov 2010 | 95 Red Rock Wy | kitchen/bath cabinet replacement. changing address from original app#201009241593 from #204 to #205m. (no work unit number change).Details
kitchen/bath cabinet replacement. changing address from original app#201009241593 from #204 to #205m. (no work unit number change). | |
| Sep 24, 2010 | Expired or cancelled cancelled Dec 2010 | 95 Red Rock Wy | replace in kind kitchen cabinets, bath vanity, no structural changes, no new light, no windows, no doors and no wall work on this permitDetails
replace in kind kitchen cabinets, bath vanity, no structural changes, no new light, no windows, no doors and no wall work on this permit | $7,500 |
| Dec 9, 2008 | Completed final sign-off Mar 2009 | 676 Alvarado St | master bath remodel. remove portion of interior wall, replace with new header beam. replace lavatory, toilet, as is. add shower/tub new locationDetails
master bath remodel. remove portion of interior wall, replace with new header beam. replace lavatory, toilet, as is. add shower/tub new location | $17,500 |
| Aug 6, 2007 | Expired or cancelled expired Jul 2009 | 2745 Laguna St | add new full bathroom to (e) hallway accove on the 1st level, includes plumbing, electrical & mechanicalDetails
add new full bathroom to (e) hallway accove on the 1st level, includes plumbing, electrical & mechanical | $20,000 |
| May 23, 2007 | Never finaled issued May 2007, no final | 355 Buena Vista East Av | replace kitchen cabinets, counters, sink, replace bath vanity sink, new bath floor . add 1 elect. outlet in kchn. add 1 elec outlet in bath, elec in bedroom, move bath sink drain and water.Details
replace kitchen cabinets, counters, sink, replace bath vanity sink, new bath floor . add 1 elect. outlet in kchn. add 1 elec outlet in bath, elec in bedroom, move bath sink drain and water. | $17,000 |
| Feb 1, 2006 | Completed final sign-off Feb 2006 | 50 Van Buren St | install interior french doors btwn bedroom and bath, install int fixed window to enclose dressing rmDetails
install interior french doors btwn bedroom and bath, install int fixed window to enclose dressing rm | $2,500 |