Permit GraphShortlistSan Francisco building permits since 2000

Dario's Painting

Contractor license
698750
State license record
Based in
San Francisco
On San Francisco permits
Jan 2002 to Dec 2005
Last 24 months
0 permits filed

5 permits since 2000: 4 completed, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllStairs 1Bathroom remodel 1

1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 84 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Aug 22, 2002Completed
final sign-off Nov 2002
123 Ulloa Strepair wrotten word on bath sides of front balcony, break some stucco to be able to replace 2x10"(p.
Details
Permit
200208224665
Status
complete
Filed
Aug 22, 2002
Permit issued
Aug 22, 2002
Final sign-off
Nov 14, 2002
Declared cost
$1,200
Address
123 Ulloa St

repair wrotten word on bath sides of front balcony, break some stucco to be able to replace 2x10"(p.

Open the permit page

$1,200