Daoust Design And Construction

Contractor license
987601
State license record
Based in
Oakland
On San Francisco permits
Aug 2014 to May 2018
Last 24 months
0 permits filed

8 permits since 2000: 7 completed, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllStairs 1Bathroom remodel 1

1 bathroom remodel permit: 1 completed. Typically 202 days from filing to permit and 783 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Sep 4, 2015Completed
final sign-off May 2018
832 Fell Stfront (main) building: finish 3 uncompleted bathrooms per plan. remove concrete driveway and replace pathway at side property. remove (e) curbcut and replace with new curbcut. relocate washer and dryer.
Details
Permit
201509046189
Status
complete
Filed
Sep 4, 2015
Permit issued
Mar 24, 2016
Final sign-off
May 16, 2018
Declared cost
$200,000
Address
832 Fell St

front (main) building: finish 3 uncompleted bathrooms per plan. remove concrete driveway and replace pathway at side property. remove (e) curbcut and replace with new curbcut. relocate washer and dryer.

Open the permit page

$200,000