Back to bathroom remodel contractors
Daniel J Rebarchak
- Based in
- Pacifica
- On San Francisco permits
- Dec 2009 to Dec 2010
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 2 days from filing to permit and 246 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 8, 2010 | Completed final sign-off Aug 2011 | 2275 41st Av | addition to permit #201008319934. install 2 new simpson strong walls, 2 new headers over windows,four 8 foot shear wall panels and electrical radiant floor heating mat in bathroom. all work on downstairs/garage floor.Details
addition to permit #201008319934. install 2 new simpson strong walls, 2 new headers over windows,four 8 foot shear wall panels and electrical radiant floor heating mat in bathroom. all work on downstairs/garage floor. | $4,200 |
| Aug 31, 2010 | Completed final sign-off May 2011 | 2275 41st Av | remodel dwonstair/garage floor. new bed room, new full bathroom. new electrical and plumbing fixtures. replace (e) windows with new energy efficient windows.Details
remodel dwonstair/garage floor. new bed room, new full bathroom. new electrical and plumbing fixtures. replace (e) windows with new energy efficient windows. | $26,000 |