Back to bathroom remodel contractors
Daniel Gallagher Construction
- Based in
- Tiburon
- On San Francisco permits
- Mar 2010 to Dec 2016
- Last 24 months
- 0 permits filed
3 permits since 2000: 1 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 never finaled. Typically 52 days from filing to permit and 94 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 2, 2016 | Never finaled issued Mar 2017, no final | 1134 Lake St | 2nd floor: remove and replace kitchen cabinets, remove and replace bathroom fixtures, convert extg closet into 2nd bathroom. add center wall to back room. replace 4 windows at rear in kind.Details
2nd floor: remove and replace kitchen cabinets, remove and replace bathroom fixtures, convert extg closet into 2nd bathroom. add center wall to back room. replace 4 windows at rear in kind. | $65,000 |
| Mar 22, 2010 | Completed final sign-off Jun 2010 | 2242 Filbert St | re-install insulation, sheetrock, tiles, trim in bedroom, closet, bathroom, toilet roomDetails
re-install insulation, sheetrock, tiles, trim in bedroom, closet, bathroom, toilet room | $7,000 |