Back to bathroom remodel contractors
Dan Richman Builder
- Based in
- San Francisco
- On San Francisco permits
- Jan 2001 to Apr 2012
- Last 24 months
- 0 permits filed
33 permits since 2000: 27 completed, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 1 completed, 2 never finaled. Typically 0 days from filing to permit and 72 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 23, 2011 | Never finaled issued Oct 2012, no final | 1739 10th Av | demo(e) 6'x10' storage @ rear bldg & (e) deck. replace w/ new 8'x10' room & 7'x 10' redwood deck. install (n) bathroom-sink, tub, toilet. reroof entire extension on bldg.Details
demo(e) 6'x10' storage @ rear bldg & (e) deck. replace w/ new 8'x10' room & 7'x 10' redwood deck. install (n) bathroom-sink, tub, toilet. reroof entire extension on bldg. | $32,000 |
| Feb 5, 2008 | Completed final sign-off Apr 2008 | 1607 09th Av | remodel bathroom on the 2nd floor. reconfigure ex. bathroom and replace ex. window with a new 16"x 24" awning window. replace floor covering and lighting. work only in the upper unit.Details
remodel bathroom on the 2nd floor. reconfigure ex. bathroom and replace ex. window with a new 16"x 24" awning window. replace floor covering and lighting. work only in the upper unit. | $15,000 |
| May 4, 2005 | Never finaled issued May 2005, no final | 915 Elizabeth St | remodel kitchen and upstairs bathroom, replace garage doorDetails
remodel kitchen and upstairs bathroom, replace garage door | $92,000 |