Back to bathroom remodel contractors
Dan Mccann Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2014 to Aug 2024
- Last 24 months
- 0 permits filed
11 permits since 2000: 10 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 1 days from filing to permit and 309 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 15, 2023 | Completed final sign-off Jun 2025 | 3237 Octavia St | revision to bp #202308043815. changing apt#2 to apt #3, only electrical in unit#3 and patching, no wk in unit#2, unit#1 new electrical one bathroom and one kitchen remodelDetails
revision to bp #202308043815. changing apt#2 to apt #3, only electrical in unit#3 and patching, no wk in unit#2, unit#1 new electrical one bathroom and one kitchen remodel | |
| Aug 4, 2023 | Completed final sign-off Dec 2023 | 66 Central Av | 1.5 bath remodel. one for one replacement of plumbing fixtures replacement of finishes including wallboard, tile floors, showers, shower walls, replacemnt in kind of one window new exhaust fan, vent to exterior no walls are to be relocated or rem0ved no plumbing fixtures are to be relocatedDetails
1.5 bath remodel. one for one replacement of plumbing fixtures replacement of finishes including wallboard, tile floors, showers, shower walls, replacemnt in kind of one window new exhaust fan, vent to exterior no walls are to be relocated or rem0ved no plumbing fixtures are to be relocated | $30,000 |
| Aug 4, 2023 | Completed final sign-off Jun 2025 | 3237 Octavia St | unit 1 & 2: remodel (1) bath, (1) kitchen, painting no structural work unit 2: patching for electrical workDetails
unit 1 & 2: remodel (1) bath, (1) kitchen, painting no structural work unit 2: patching for electrical work | $15,000 |
| Nov 24, 2020 | Completed final sign-off May 2022 | 601 Grand View Av | interior remodel of sfd to include new 43sf bathroom in (e) garage. new plumbing, electrical and interior finishes as required. new flr framing over (e) slab. new window and door to replace (e). new machanical equipment to replace (e)Details
interior remodel of sfd to include new 43sf bathroom in (e) garage. new plumbing, electrical and interior finishes as required. new flr framing over (e) slab. new window and door to replace (e). new machanical equipment to replace (e) | $18,500 |
| Aug 21, 2018 | Completed final sign-off Dec 2018 | 282 18th Av | unit 4: remodel kitchen and bathroom in kind. new cabinets, flooring, and tiles. "non-structural" no wall modification.Details
unit 4: remodel kitchen and bathroom in kind. new cabinets, flooring, and tiles. "non-structural" no wall modification. | $25,000 |