Dan Gillies Construction Services Inc
- Based in
- Kentfield
- On San Francisco permits
- Feb 2009 to Apr 2026
- Last 24 months
- 9 permits filed
63 permits since 2000: 36 completed, 5 in progress, 8 never finaled, 14 expired or cancelled.
Of the 8 never-finaled permits, 1 is 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
8 deck permits: 5 completed, 1 never finaled, 2 expired or cancelled. Typically 30 days from filing to permit and 200 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 28, 2021 | Expired or cancelled expired Mar 2026 | 2842 Filbert St | basement fl-replace perimeter concrete foundation at rear. add (n) workout rm, (n) bath. 1st flr-enlarge (e) fam rm, add (n) deck & stairs to rear yard. 2nd flr-add (n) deck off (e) dining rm. 3rd flr-replace (e) glass guardrail & (e) sliding glass door systemDetails
basement fl-replace perimeter concrete foundation at rear. add (n) workout rm, (n) bath. 1st flr-enlarge (e) fam rm, add (n) deck & stairs to rear yard. 2nd flr-add (n) deck off (e) dining rm. 3rd flr-replace (e) glass guardrail & (e) sliding glass door system | $325,000 |
| Feb 24, 2021 | Expired or cancelled expired Jan 2026 | 2 Belgrave Av | basement: remodel & horizontal ext. add (1) bedroom & (1) powder rm + wine storage. 1st fl: living rm. expansion, expand (e) deck; remodel kitchen; garage connection & (n) sliding glass doors @ living rm & dining rm. 2nd fl: remodel (e) master bath rm; (1) dormer to master bd & (1) bath to (e) bedrDetails
basement: remodel & horizontal ext. add (1) bedroom & (1) powder rm + wine storage. 1st fl: living rm. expansion, expand (e) deck; remodel kitchen; garage connection & (n) sliding glass doors @ living rm & dining rm. 2nd fl: remodel (e) master bath rm; (1) dormer to master bd & (1) bath to (e) bedr | $600,000 |
| Jun 6, 2019 | Completed final sign-off Aug 2020 | 685 Lakeview Av | infill (e) deck in lighwell with a (n) exterior wall and roof. replace (e) deck in lighwell weith a (n) bathroom. expand (e) closet in bedroom and add a (n) door into (n) bathroom. replace (e) window in bedroom with a larger wndow and move (e) door. remodel (e) bathroom. move w/d.Details
infill (e) deck in lighwell with a (n) exterior wall and roof. replace (e) deck in lighwell weith a (n) bathroom. expand (e) closet in bedroom and add a (n) door into (n) bathroom. replace (e) window in bedroom with a larger wndow and move (e) door. remodel (e) bathroom. move w/d. | $25,000 |
| Jun 26, 2017 | Completed final sign-off Oct 2017 | 956 South Van Ness Av | revision to app#201606160106. repair extg rear walls on 1st floor due to dry rot and deck above. reconfiguration of interior closets on 2nd floor. replace extg kitchen windows and french door. replace ext windows on 2nd floor.Details
revision to app#201606160106. repair extg rear walls on 1st floor due to dry rot and deck above. reconfiguration of interior closets on 2nd floor. replace extg kitchen windows and french door. replace ext windows on 2nd floor. | |
| Dec 8, 2016 | Completed final sign-off Aug 2017 | 79 Buena Vista Tr | replace e sunroom at rear into deck on 2nd and 3rd floor in kindDetails
replace e sunroom at rear into deck on 2nd and 3rd floor in kind | $25,000 |
| Nov 28, 2016 | Never finaled issued Nov 2016, no final | 79 Buena Vista Tr | repair of less than 50% of rear deck in kindDetails
repair of less than 50% of rear deck in kind | $5,000 |
| Sep 27, 2011 | Completed final sign-off Oct 2011 | 200 Belgrave Av | revision to pa# 2011.08.04.8133 and 2009.02.19.2379. 1st fl: media rm, closet, add wet bar, guest suite bath. 2nd fl: kitchen,office, deck. 3rd fl> bath rm, bed rm, master bath and bed rm, add skylight at bedrm and closetDetails
revision to pa# 2011.08.04.8133 and 2009.02.19.2379. 1st fl: media rm, closet, add wet bar, guest suite bath. 2nd fl: kitchen,office, deck. 3rd fl> bath rm, bed rm, master bath and bed rm, add skylight at bedrm and closet | |
| Dec 8, 2009 | Completed final sign-off Jul 2011 | 1243 15th Av | horizontal rear addition and remodelling of an (e) 3 story sfd. 1st fl: new bedrm, fam rm, laundr, office and mud rm. 2nd fl: remodel litchen, new powder rm and stair and deck. 3rd fl: enlarge (e) bedroomDetails
horizontal rear addition and remodelling of an (e) 3 story sfd. 1st fl: new bedrm, fam rm, laundr, office and mud rm. 2nd fl: remodel litchen, new powder rm and stair and deck. 3rd fl: enlarge (e) bedroom | $80,000 |